106676-2291 ZEXEL F 01G 09U 1JC BOSCH INJECTION-PUMP ASSEMBLY f01g09u1jc 1066762291 me359471


106676-2291 INJECTION-PUMP ASSEMBLY
Rating:
67
Buy INJECTION-PUMP ASSEMBLY 106676-2291 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH F 01G 09U 1JC f01g09u1jc
ZEXEL 106676-2291 1066762291
MITSUBISHI ME359471 me359471

Service parts 106676-2291 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106061-5810
3. GOVERNOR 105487-7610
4. SUPPLY PUMP 105207-1041
5. AUTOM. ADVANCE MECHANIS 105681-2950
6. COUPLING PLATE 105662-0710
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2)
13. NOZZLE-HOLDER
14. NOZZLE
15. NOZZLE SET

Include in #1:

106676-2291 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 01G 09U 1JC f01g09u1jc
ZEXEL 106676-2291 1066762291
MITSUBISHI ME359471 me359471


Zexel num
Bosch num
Firm num
Name
106676-2291 
F 01G 09U 1JC 
ME359471  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D24

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   7.4
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   104.5 101.9 107.1
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   5.1+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   14.5 12.3 16.7
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(7.4)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   104.5 103.5 105.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(7.4)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   121.5 113.5 129.5
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   F
Rack position   9.8+-0.5
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   110 90 130
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   850--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   (800)
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1000
Advance angle deg.   4 3.5 4.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106676-2291
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Tolerance for racks not indicated: +-0.05mm. (4)Excess fuel setting for starting: SXL (N = N1) (5)Damper spring setting (6)When air cylinder is operating.
----------
SXL=9.3+0.2mm N1=225r/min
----------

Speed control lever angle

Test data 106676-2291
F:Full speed I:Idle (1)Speed = aa (before setting air cylinder) (2)Speed = bb (after setting the air cylinder) (3)Speed = cc (before setting air cylinder) (4)Air cylinder's adjustable range (5)R=dd(PIN)
----------
aa=1200r/min bb=1130r/min cc=300r/min dd=150mm
----------
a=(21deg)+-5deg b=(13deg)+-5deg c=(2deg)+-5deg d=(2deg)

0000000901

Test data 106676-2291
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=20.5deg+-3deg b=21deg+-5deg

Stop lever angle

Test data 106676-2291
S:Stop the pump. (1)Drive side (2)Use the hole at R = aa (3)Normal (free)
----------
aa=38.5mm
----------
a=20deg+-5deg b=64deg+-5deg

0000001501 2-STAGE CHANGEOVER DEVICE

Test data 106676-2291
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------

Timing setting

Test data 106676-2291
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=15deg
----------
a=(5deg)




Have questions with 106676-2291?





Group cross 106676-2291 ZEXEL

Mitsubishi 

9 400 611 623 
ME158725 
INJECTION-PUMP ASSEMBLY
6D24TC
F 019 Z20 148 
ME442612 
INJECTION-PUMP ASSEMBLY
6D24TC
9 400 617 435 
ME158724 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 611 624 
ME158723 
INJECTION-PUMP ASSEMBLY
6D24
F 019 Z20 149 
ME442611 
INJECTION-PUMP ASSEMBLY
6D24
9 400 617 436 
ME153110 
INJECTION-PUMP ASSEMBLY
6D24T1
9 400 617 437 
ME158240 
INJECTION-PUMP ASSEMBLY
6D24TC
9 400 612 007 
ME158626 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY
6D24

Mitsubishi 

9 400 617 438 
ME158800 
INJECTION-PUMP ASSEMBLY
6D24
 
ME444775 
INJECTION-PUMP ASSEMBLY
6D24
9 400 617 439 
ME153213 
INJECTION-PUMP ASSEMBLY
6D22T2
9 400 612 922 
ME153189 
INJECTION-PUMP ASSEMBLY
6D24
106676-2291  
F 01G 09U 1JC 
ME359471 
INJECTION-PUMP ASSEMBLY
6D24
Back to top