106676-2250 ZEXEL 9 400 617 437 BOSCH INJECTION-PUMP ASSEMBLY 9400617437 1066762250 me158240


106676-2250 INJECTION-PUMP ASSEMBLY
Rating:
60
Buy INJECTION-PUMP ASSEMBLY 106676-2250 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 617 437 9400617437
ZEXEL 106676-2250 1066762250
MITSUBISHI ME158240 me158240

Cross reference number

BOSCH 9 400 617 437 9400617437
ZEXEL 106676-2250 1066762250
MITSUBISHI ME158240 me158240


Zexel num
Bosch num
Firm num
Name
106676-2250 
9 400 617 437 
ME158240  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D24TC K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.6
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   168.5 165.5 171.5
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Boost pressure kPa   51.3 51.3
Boost pressure mmHg   385 385
Injection quantity adjustment_02
Adjusting point   B
Rack position   6+-0.5
Pump speed r/min   425 425 425
Average injection quantity mm3/st.   8 5.4 10.6
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   195 175 215
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Rack limit   *
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   R1-1.4
Boost pressure kPa   5.3 4 6.6
Boost pressure mmHg   40 30 50
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   R1(10.6)
Boost pressure kPa   38 31.3 44.7
Boost pressure mmHg   285 235 335
Timer adjustment
Pump speed r/min   825--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   775
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   975
Advance angle deg.   1 0.5 1.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106676-2250
N:Pump speed R:Rack position (mm) (1)Notch fixed: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting (6)Boost compensator stroke: BCL
----------
K=9 BCL=1.4+-0.1mm
----------

Speed control lever angle

Test data 106676-2250
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=(20deg)+-5deg b=(2deg)+-5deg

Stop lever angle

Test data 106676-2250
N:Pump normal S:Stop the pump. (1)Pump speed aa and rack position bb (to be sealed at delivery) (2)Stopper bolt setting
----------
aa=0r/min bb=1-0.5mm
----------
a=35deg+-5deg b=70deg+-5deg

0000001501 TAMPER PROOF

Test data 106676-2250
Tamperproofing-equipped boost compensator cover installation procedure (A) After adjusting the boost compensator, tighten the bolts to remove the heads. (1)Before adjusting the governor and the boost compensator, tighten the screw to the specified torque. (Tightening torque T = T1 maximum) (2)After adjusting the governor and the boost compensator, tighten to the specified torque to break off the bolt heads. (Tightening torque T = T2)
----------
T1=2.5N-m(0.25kgf-m) T2=2.9~4.4N-m(0.3~0.45kgf-m)
----------

Timing setting

Test data 106676-2250
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=13deg
----------
a=(7deg)




Have questions with 106676-2250?





Group cross 106676-2250 ZEXEL

Mitsubishi 

9 400 611 623 
ME158725 
INJECTION-PUMP ASSEMBLY
6D24TC
F 019 Z20 148 
ME442612 
INJECTION-PUMP ASSEMBLY
6D24TC
9 400 617 435 
ME158724 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 611 624 
ME158723 
INJECTION-PUMP ASSEMBLY
6D24
F 019 Z20 149 
ME442611 
INJECTION-PUMP ASSEMBLY
6D24
9 400 617 436 
ME153110 
INJECTION-PUMP ASSEMBLY
6D24T1
106676-2250  
9 400 617 437 
ME158240 
INJECTION-PUMP ASSEMBLY
6D24TC
9 400 612 007 
ME158626 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY
6D24

Mitsubishi 

9 400 617 438 
ME158800 
INJECTION-PUMP ASSEMBLY
6D24
 
ME444775 
INJECTION-PUMP ASSEMBLY
6D24
9 400 617 439 
ME153213 
INJECTION-PUMP ASSEMBLY
6D22T2
9 400 612 922 
ME153189 
INJECTION-PUMP ASSEMBLY
6D24
F 01G 09U 1JC 
ME359471 
INJECTION-PUMP ASSEMBLY
6D24
Back to top