Rating:
Information injection-pump assembly
ZEXEL
106676-2121
1066762121
Service parts 106676-2121 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
ME151161
12.
Open Pre:MPa(Kqf/cm2)
15.7{160}/21.6{220}
14.
NOZZLE
Include in #1:
106676-2121
as INJECTION-PUMP ASSEMBLY
Cross reference number
ZEXEL
106676-2121
1066762121
Zexel num
Bosch num
Firm num
Name
106676-2121
INJECTION-PUMP ASSEMBLY
14CA PE6P,6PD PE
14CA PE6P,6PD PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8250
Bosch type code
1 688 901 101
Nozzle
105780-0120
Bosch type code
1 688 901 990
Nozzle holder
105780-2190
Opening pressure
MPa
20.7
Opening pressure
kgf/cm2
211
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
131425-0220
Overflow valve opening pressure
kPa
157
123
191
Overflow valve opening pressure
kgf/cm2
1.6
1.25
1.95
Tester oil delivery pressure
kPa
255
255
255
Tester oil delivery pressure
kgf/cm2
2.6
2.6
2.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
3.9
3.85
3.95
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
-
Rack position
13.3
Pump speed
r/min
700
700
700
Each cylinder's injection qty
mm3/st.
164
159.9
168.1
Basic
*
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
Z
Rack position
8+-0.5
Pump speed
r/min
410
410
410
Each cylinder's injection qty
mm3/st.
21
17.8
24.2
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(13.3)
Pump speed
r/min
700
700
700
Average injection quantity
mm3/st.
164
162
166
Basic
*
Fixing the lever
*
Boost pressure
kPa
31.3
31.3
Boost pressure
mmHg
235
235
Injection quantity adjustment_04
Adjusting point
B
Rack position
(R1+0.95
)+0.05-0
.1
Pump speed
r/min
1100
1100
1100
Average injection quantity
mm3/st.
150.5
146.5
154.5
Fixing the lever
*
Boost pressure
kPa
31.3
31.3
Boost pressure
mmHg
235
235
Injection quantity adjustment_05
Adjusting point
C
Rack position
(R1-1.05
)
Pump speed
r/min
500
500
500
Average injection quantity
mm3/st.
158
152
164
Fixing the lever
*
Boost pressure
kPa
31.3
31.3
Boost pressure
mmHg
235
235
Boost compensator adjustment
Pump speed
r/min
250
250
250
Rack position
R2-2
Boost pressure
kPa
6.7
5.4
8
Boost pressure
mmHg
50
40
60
Boost compensator adjustment_02
Pump speed
r/min
250
250
250
Rack position
R2(R1-1.
3)
Boost pressure
kPa
18
18
18
Boost pressure
mmHg
135
135
135
Timer adjustment
Pump speed
r/min
(N1+50)-
-
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
N1
Advance angle
deg.
0.5
Remarks
Measure the actual speed.
Measure the actual speed.
Timer adjustment_03
Pump speed
r/min
-
Advance angle
deg.
2
1.5
2.5
Remarks
Measure the actual speed, stop
Measure the actual speed, stop
Test data Ex:
Governor adjustment
N:Pump speed
R:Rack position (mm)
(1)Torque cam stamping: T1
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Boost compensator stroke: BCL
(4)Damper spring setting
----------
T1=AE83 BCL=2+-0.1mm
----------
----------
T1=AE83 BCL=2+-0.1mm
----------
Speed control lever angle
F:Full speed
I:Idle
(1)Use the hole at R = aa
(2)Stopper bolt set position 'H'
(3)Viewed from feed pump side.
----------
aa=37.5mm
----------
a=2deg+-5deg b=37deg+-3deg
----------
aa=37.5mm
----------
a=2deg+-5deg b=37deg+-3deg
Stop lever angle
N:Pump normal
S:Stop the pump.
(1)Use the hole at R = aa
(2)Normal engine position (equivalent to R = bb).
(3)Set the stopper bolt so that speed = cc and rack position = dd (and confirm non-injection).
----------
aa=54mm bb=18mm cc=1100r/min dd=3.5+-0.3mm
----------
a=(20.5deg) b=29.5deg+-5deg c=40deg+-5deg
----------
aa=54mm bb=18mm cc=1100r/min dd=3.5+-0.3mm
----------
a=(20.5deg) b=29.5deg+-5deg c=40deg+-5deg
Timing setting
(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=11deg
----------
a=(8deg)
----------
aa=11deg
----------
a=(8deg)
Have questions with 106676-2121?
Group cross 106676-2121 ZEXEL
Mitsubishi
Mitsubishi
106676-2121
INJECTION-PUMP ASSEMBLY