106673-5000 ZEXEL 9 400 617 314 BOSCH INJECTION-PUMP ASSEMBLY 9400617314 1066735000 1671496560


106673-5000 INJECTION-PUMP ASSEMBLY
Rating:
54
Buy INJECTION-PUMP ASSEMBLY 106673-5000 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 617 314 9400617314
ZEXEL 106673-5000 1066735000
NISSAN-DIESEL 1671496560 1671496560

Cross reference number

BOSCH 9 400 617 314 9400617314
ZEXEL 106673-5000 1066735000
NISSAN-DIESEL 1671496560 1671496560


Zexel num
Bosch num
Firm num
Name
106673-5000 
9 400 617 314 
1671496560  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
PE6TA K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.65 3.6 3.7
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.8
Pump speed r/min   650 650 650
Average injection quantity mm3/st.   166.5 164.5 168.5
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Boost pressure kPa   76 76
Boost pressure mmHg   570 570
Solenoid boost comp. OFF   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.7+-0.5
Pump speed r/min   270 270 270
Average injection quantity mm3/st.   15.5 14.5 16.5
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Solenoid boost comp. OFF   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   9.75
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   110 107 113
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Solenoid boost comp. OFF   *
Boost compensator adjustment
Pump speed r/min   400 400 400
Rack position   9.75
Boost pressure kPa   20 18.7 21.3
Boost pressure mmHg   150 140 160
Boost compensator adjustment_02
Pump speed r/min   400 400 400
Rack position   11.8
Boost pressure kPa   46 42 50
Boost pressure mmHg   345 315 375
Boost compensator adjustment_03
Pump speed r/min   400 400 400
Rack position   (12.8)
Boost pressure kPa   62.7 62.7 62.7
Boost pressure mmHg   470 470 470
Timer adjustment
Pump speed r/min   875--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   825
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   925
Advance angle deg.   1 0.5 1.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106673-5000
N:Pump speed R:Rack position (mm) (1)Lever ratio: RT (2)Target shim dimension: TH (3)Tolerance for racks not indicated: +-0.05mm. (4)Solenoid boost compensator OFF: SBL (5)Rack limit using the stop lever: R1 (6)Boost compensator stroke: BCL (7)Damper spring setting (8)Rack difference between N = N1 and N = N2 (9)Variable speed specification: idling adjustment (10)Fix the lever at the full-load position at delivery. (11)Main spring setting
----------
RT=1 TH=2.2mm SBL=(13.3)mm R1=12.8+0.2mm BCL=(3.05)mm N1=1100r/min N2=650r/min
----------

Speed control lever angle

Test data 106673-5000
F:Full speed I:Idle (1)Pump speed = aa (2)Set the stopper bolt (fixed at full-load position at delivery.)
----------
aa=290r/min
----------
a=(16deg)+-5deg b=(8deg)+-5deg

0000000901

Test data 106673-5000
F:Full load I:Idle (1)Stopper bolt setting (2)Use the hole at R = aa
----------
aa=42mm
----------
a=31.5deg+-3deg b=45deg+-5deg

Stop lever angle

Test data 106673-5000
N:Pump normal S:Stop the pump. (1)Rack position aa (pump speed bb r/min ) (2)Use the pin above R = cc
----------
aa=12.8+0.2mm bb=350r/min cc=40mm
----------
a=(42deg)+-5deg b=41deg+-5deg

0000001501 BCS

Test data 106673-5000
(A) Screw for precise adjustment (B) Pre-adjustment screw (C) Control rack, rack decrease direction (D) Rack limit 1. Solenoid boost compensator adjustment (1)Supply DC: V1 to the solenoid terminals and confirm solenoid operation. (2)With the solenoid ON, calculate L1 from the value of R1. [L1 = La - (10.5 - R1) +-0.2] (3)Adjust (B) to obtain L1. (4)Assemble the solenoid to the governor. (5)With the solenoid ON, readjust (B) so that R1 is within the allowance a. (6)With the solenoid OFF, perform all governor adjustments except rack limit adjustment. (7)Set the pump speed at N1 and turn the solenoid ON. (8)Adjust (A) so that R1 is within the allowance range a. (9)Set the pump speed at N1 and fix the load lever in the full position (10)Turn the solenoid switch ON and OFF several times and confirm that the difference in rack positions is within L2. (11)Set the rack limit. (12)Stamp the solenoid valve.
----------
V1=24V N1=400r/min N2=0r/min R1=9.3mm a=+-0.5mm La=28mm L1=26.8+-0.2mm L2=3.5~5mm
----------

0000001601 TAMPER PROOF

Test data 106673-5000
Tamperproofing-equipped boost compensator cover installation procedure (A): After adjusting the boost compensator, assemble then tighten the bolts to remove the heads. (B): Specified torque (1)Before adjusting the governor and the boost compensator, tighten the screw to the specified torque. (Tightening torque T = T1 maximum) (2)After adjusting the governor and the boost compensator, tighten to the specified torque to break off the bolt heads. (Tightening torque T = T2)
----------
T1=2.5N-m(0.25kgf-m) T2=2.9~4.4N-m(0.3~0.45kgf-m)
----------

Timing setting

Test data 106673-5000
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(30deg)




Have questions with 106673-5000?





Group cross 106673-5000 ZEXEL

Nissan-Diesel 

106673-5000  
9 400 617 314 
1671496560 
INJECTION-PUMP ASSEMBLY
PE6TA
9 400 612 277 
1679096613 
INJECTION-PUMP ASSEMBLY
PE6T44
F 01G 09U 1JE 
1679096613 
INJECTION-PUMP ASSEMBLY
PE6T44KJ
9 400 617 315 
16790NB003 
INJECTION-PUMP ASSEMBLY
PF6TI
9 400 617 316 
16790NB004 
INJECTION-PUMP ASSEMBLY
PF6TA
9 400 613 388 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 613 510 
16790NB005 
INJECTION-PUMP ASSEMBLY
PF6TA
9 400 617 317 
16790NB006 
INJECTION-PUMP ASSEMBLY
PF6TI
9 400 617 318 
16790NB007 
INJECTION-PUMP ASSEMBLY
PF6TA
Back to top