101603-0920 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016030920 1156019610


101603-0920 INJECTION-PUMP ASSEMBLY
Rating:
69
Buy INJECTION-PUMP ASSEMBLY 101603-0920 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 101603-0920 1016030920
ISUZU 1156019610 1156019610

Cross reference number

ZEXEL 101603-0920 1016030920
ISUZU 1156019610 1156019610


Zexel num
Bosch num
Firm num
Name
101603-0920 
101603-4050 
 
1156019610  ISUZU
INJECTION-PUMP ASSEMBLY
6SA1T * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.7 3.65 3.75
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   12.6
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   116.3 114.7 117.9
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   280 280 280
Average injection quantity mm3/st.   9.4 7.4 11.4
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.6)
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   116.3 115.3 117.3
Basic   *
Fixing the lever   *
Remarks
After setting aneroid compensatory.
 
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-0.3
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   112.8 109.6 116
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   R2(14.2)
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   102.5 102.5 112.5
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   950--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   900
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1250
Advance angle deg.   2 1.5 2.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101603-0920
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT
----------
T1=B40
----------

Speed control lever angle

Test data 101603-0920
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=19deg+-5deg b=28deg+-3deg

Stop lever angle

Test data 101603-0920
N:Pump normal S:Stop the pump.
----------

----------
a=25deg+-5deg b=40deg+-5deg

0000001501 ACS

Test data 101603-0920
(A) Housing (B) Snap ring (C) adjusting screw (D) Set screw (E): Push rod (F) Spacer 1. Adjustment of the aneroid compensator (1)Adjust with the (D) set screw so that the clearance between the (A) housing and (B) snap ring is L1. (2)Select the push rod (E) so that the distance from the end surface of the (F) spacer becomes L2. (3)(C) Turn the screw to adjust the beginning of aneroid compensator operation. 2. Adjustment when mounting the governor. (1)Set the speed of the pump to N1 r/min and fix the control lever at the full set position. (2)Adjust using screw C to obtain the performance shown in the graph above. (3)After final adjustment, confirm that the gap between housing (A) and snapring (B) is L3.
----------
N1=850r/min L1=1.4~1.7mm L2=0.5+-0.5mm L3=0.1~0.5mm
----------
Ra=R1(12.6)mm Rb=R3(12)mm Pa=4+-2.7kPa(30+-20mmHg) Pb=36kPa(270mmHg) Q1=116.3+-1mm3/st Q2=103.6+-1.6mm3/st

Timing setting

Test data 101603-0920
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=9deg
----------
a=(40deg)




Have questions with 101603-0920?





Group cross 101603-0920 ZEXEL

Isuzu 

 
1156018510 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156018512 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156019600 
INJECTION-PUMP ASSEMBLY
6SA1T
101603-0920  

101603-4050 
 
1156019610 
INJECTION-PUMP ASSEMBLY
6SA1T
 
1156018040 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156018042 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156019132 
INJECTION-PUMP ASSEMBLY
6BD1T
9 400 615 008 
1156019134 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
1156019072 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 615 009 
1156019074 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018982 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156018983 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 615 010 
1156018985 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156016693 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156016703 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156016713 
INJECTION-PUMP ASSEMBLY
6BG1
Back to top