101601-4170 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016014170 5156003115


101601-4170 INJECTION-PUMP ASSEMBLY
Rating:
36
Buy INJECTION-PUMP ASSEMBLY 101601-4170 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 101601-4170 1016014170
ISUZU 5156003115 5156003115

Service parts 101601-4170 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-0570
3. GOVERNOR 105931-0000
4. SUPPLY PUMP 105220-4560
5. AUTOM. ADVANCE MECHANIS 105612-1540
6. COUPLING PLATE 105661-3230
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4582
11. Nozzle and Holder 5-15300-089-1
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105031-3952
14. NOZZLE 105015-4130
15. NOZZLE SET

Include in #1:

101601-4170 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101601-4170 1016014170
ISUZU 5156003115 5156003115


Zexel num
Bosch num
Firm num
Name
101601-4170 
101601-4650 
 
5156003115  ISUZU
INJECTION-PUMP ASSEMBLY
6BD1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.1+-0. 5
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   66.8 65.8 67.8
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   11.2+-0. 5
Pump speed r/min   1600 1600 1600
Average injection quantity mm3/st.   74 72.4 75.6
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   11.05+-0 .5
Pump speed r/min   1300 1300 1300
Average injection quantity mm3/st.   71 69.4 72.6
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   D
Rack position   10.85+-0 .5
Pump speed r/min   650 650 650
Average injection quantity mm3/st.   48 46.4 49.6
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   -
Rack position   9.5+-0.5
Pump speed r/min   325 325 325
Average injection quantity mm3/st.   9.3 8 10.6
Fixing the rack   *
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   85 85 90
Fixing the rack   *
Rack limit   *
Timer adjustment
Pump speed r/min   1350+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1500
Advance angle deg.   2.1 1.6 2.6
Timer adjustment_03
Pump speed r/min   1600
Advance angle deg.   4 3.5 4.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101601-4170
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT (3)Because the figures in brackets are the target values at torque cam adjustment, perform final adjustment in accordance with governor and injection quantity adjustment standards. (4)Perform governor spring adjustment by setting lever a. (5)After adjustment of the lever a setting, set the lever so that idle set point H can be obtained and confirm standard b. (6)After completing final adjustment, set the lever to obtain J. (7)Next, confirm rack position R1 or more is obtained when rotation is stopped. (8)In this condition, move the lever to the full position and confirm standard c. (excess fuel for starting operation limit). (9)After completing final adjustment, set speed at N1 using lever b. (10)In this condition, after operating the lever to the full position, confirm no excess fuel for starting (black smoke prevention limit). (11)For the excess fuel setting for starting rack position point I set the lever to obtain standard c in step (8) and then set the rack limit.
----------
T1=01 R1=12mm N1=225r/min
----------

Speed control lever angle

Test data 101601-4170
F:Full speed I:Idle (1)Stopper bolt set position 'b.'
----------

----------
a=40deg+-5deg b=39deg+-3deg




Have questions with 101601-4170?





Group cross 101601-4170 ZEXEL

Isuzu 

 
5156004403 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156001158 

6BB1
 
5156002956 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156004422 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156006071 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156006212 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156005612 
INJECTION-PUMP ASSEMBLY
6BB1
9 400 614 587 
5156005613 
INJECTION-PUMP ASSEMBLY
6BB1
101601-4170  

101601-4650 
 
5156003115 
INJECTION-PUMP ASSEMBLY
6BD1
 
5156004243 
INJECTION-PUMP ASSEMBLY
6BD1
 
5156003964 
INJECTION-PUMP ASSEMBLY
6BD1
Back to top