108622-3424 ZEXEL F 01G 09U 0F9 BOSCH INJECTION-PUMP ASSEMBLY f01g09u0f9 1086223424


108622-3424 INJECTION-PUMP ASSEMBLY
Rating:
39
Buy INJECTION-PUMP ASSEMBLY 108622-3424 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH F 01G 09U 0F9 f01g09u0f9
ZEXEL 108622-3424 1086223424

Service parts 108622-3424 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 108062-3271
3. GOVERNOR 105489-4943
4. SUPPLY PUMP 105237-4690
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0740
7. COUPLING PLATE 156638-9920
9. _
10. NOZZLE AND HOLDER ASSY 105101-7892
11. Nozzle and Holder 23600-2781
12. Open Pre:MPa(Kqf/cm2) 16.7{170}/23.5{240}
13. NOZZLE-HOLDER 105030-3612
14. NOZZLE
15. NOZZLE SET 105019-0391

Include in #1:

108622-3424 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 01G 09U 0F9 f01g09u0f9
ZEXEL 108622-3424 1086223424


Zexel num
Bosch num
Firm num
Name
108622-3424 
108622-3425 
F 01G 09U 0F9 
   
INJECTION-PUMP ASSEMBLY
* K 14CJ TICS HD-TI6M TICS

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   134424-1420
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   33
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-4-2-6- 3-5
Pre-stroke mm   6.4 6.37 6.43
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   A
Rack position   10.8
Pump speed r/min   550 550 550
Average injection quantity mm3/st.   185.5 183.5 187.5
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Boost pressure kPa   66.7 66.7
Boost pressure mmHg   500 500
PS407980-224* V   2.2+-0.0 1
PS407980-224* mm   4+-0.05
Injection quantity adjustment_02
Adjusting point   B
Rack position   11.3
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   199 196 202
Fixing the lever   *
Boost pressure kPa   66.7 66.7
Boost pressure mmHg   500 500
PS407980-224* V   2.2+-0.0 1
PS407980-224* mm   4+-0.05
Injection quantity adjustment_03
Adjusting point   C
Rack position   11.3+-0. 5
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   203 197 209
Fixing the lever   *
Boost pressure kPa   66.7 66.7
Boost pressure mmHg   500 500
PS407980-224* V   2.2+-0.0 1
PS407980-224* mm   4+-0.05
Injection quantity adjustment_04
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   260 255 265
Fixing the lever   *
Boost pressure kPa   66.7 66.7
Boost pressure mmHg   500 500
Rack limit   *
PS407980-224* V   2.2+-0.0 1
PS407980-224* mm   4+-0.05
Injection quantity adjustment_05
Adjusting point   E
Rack position   3.8+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   8.5 5.5 11.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   6.3+-0.0 3
Remarks
Refer to items regarding the pre-stroke actuator
 
Injection quantity adjustment_06
Adjusting point   F
Rack position   R1(8.6)
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   146.5 143.5 149.5
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
PS407980-224* V   2.2+-0.0 1
PS407980-224* mm   4+-0.05
Boost compensator adjustment
Pump speed r/min   400 400 400
Rack position   R1(8.6)
Boost pressure kPa   26.7 24.7 28.7
Boost pressure mmHg   200 185 215
Boost compensator adjustment_02
Pump speed r/min   400 400 400
Rack position   10.8
Boost pressure kPa   46.7 46.7 46.7
Boost pressure mmHg   350 350 350
Boost compensator adjustment_03
Pump speed r/min   400 400 400
Rack position   (11.6)
Boost pressure kPa   53.3 53.3 53.3
Boost pressure mmHg   400 400 400
0000001601
Pre-stroke mm   6.4 6.37 6.43
Remarks
When the timing sleeve is pushed up
 
_02
Connector angle deg.   11.5 11 12
Remarks
When the eccentric pin is tightened
 
_03
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   2.4 2.35 2.45
Output voltage V   2.95 2.94 2.96
Adjustment   *
_04
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   6.4 6.37 6.43
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_05
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Governor adjustment

Test data 108622-3424
N:Pump speed R:Rack position (mm) (1)Lever ratio: RT (2)Target shim dimension: TH (3)Tolerance for racks not indicated: +-0.05mm. (4)Set idle at point K (N = N1, R = R1) and confirm that the injection quantity does not exceed Q1 at point J (N = N2). The pre-stroke at that time must be Pr1 (Pv1). (5)Stop lever setting: R2 (6)RACK LIMIT (7)Boost compensator stroke: BCL (8)Damper spring setting
----------
RT=1 TH=1.6mm N1=325r/min R1=3.8mm N2=1000r/min Q1=3mm3/st Pr1=4+-0.05mm Pv1=2.2+-0.01V R2=(13.1)+0.5mm BCL=(3)mm
----------

Speed control lever angle

Test data 108622-3424
F:Full speed
----------

----------
a=13deg+-5deg

0000000901

Test data 108622-3424
F:Full load I:Idle (1)Stopper bolt setting (2)Use the hole at R = aa
----------
aa=45mm
----------
a=26deg+-5deg b=36.5deg+-3deg

Stop lever angle

Test data 108622-3424
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa (2)Set the rack position at bb before adjusting the governor (3)Set the stopper screw. (After setting, apply red paint.)
----------
aa=33mm bb=(13.1)+0.5mm
----------
a=36deg+-5deg b=44deg+-5deg

0000001301

Test data 108622-3424
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)Pre-stroke: aa (4)-
----------
aa=6.4+-0.03mm
----------
a=(10deg)

0000001901

Test data 108622-3424
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000002201 RACK SENSOR

Test data 108622-3424
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump Adjustment of the rack sensor (-0720) 1. Rack limit adjustment (1)After mounting the joint (B), select the shim (D) so that the rack position is in the rack limit position. (2)Install the rod (E) to the block (C). (3)At the rack limit, set the distance between the pump end face and the rod (E) to L1. 2. Rack sensor (1)Screw in the bobbin (A) until it contacts the joint (B). (2)Fix the speed control lever at the full side and set the pump speed at N1. (3)Adjust the depth that the bobbin (A) is screwed in so that the control unit's rack sensor output voltage is VR+-0.01 (V), then tighten the nut (F). (If equipped with a boost compensator, perform with boost pressure applied.) (4)Apply red paint to both the joint (B) and the nut (F) join, and the joint (B) and the pump join. Output voltage VR +-0.01(V), speed N1, rack position Ra, rack sensor supply voltage 5+-0.01 (V)
----------
L=33.5+-0.1mm N1=1000r/min Ra=11.3mm
----------

0000002301 GOVERNOR TORQUE CONTROL

Test data 108622-3424
Dr:Torque control stroke (A): Without torque control spring capsule 1. Adjustment procedures (1)Procedure is the same as that for the RFD (former type), except that the positive torque control stroke must be determined at the full lever setting. 2. Procedures for adjustment (1)Remove the torque control spring capsule. (2)Operate the pump at approximately N1. (End of idling spring operation < N1.) (3)Tilt the lever to the full side. (4)Set so that R = RF. (5)Increase the speed by pushing in the screw (attached to the bracket on the rear of the tension lever) through the adjusting window. (6)Adjust so that the torque control stroke Dr1 can be obtained. (7)Align N2 and N3 with the torque control spring capsule. 3. Final confirmation (1)After final confirmation, temporarily set the load lever to N = N1, R = idling position. (2)From this condition, increase speed to N = N4. (3)Confirm that positive torque control stroke is Dr2.
----------
N1=500r/min N2=(665)r/min N3=(755)r/min N4=1000r/min RF=10.8mm Dr1=0.5mm Dr2=0+0.3mm
----------




Have questions with 108622-3424?





Group cross 108622-3424 ZEXEL

Hino 

 
220008810A 
INJECTION-PUMP ASSEMBLY
K-3
 
220008811A 
INJECTION-PUMP ASSEMBLY
K-3
F 01G 09U 0F7 
 
INJECTION-PUMP ASSEMBLY

Hino 

F 01G 09U 0F8 
220008812A 
INJECTION-PUMP ASSEMBLY
K-3
108622-3424  

108622-3425 
F 01G 09U 0F9 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 611 212 
220008814A 
INJECTION-PUMP ASSEMBLY
K-3
9 400 619 828 
220008815A 
INJECTION-PUMP ASSEMBLY
K-3
9 400 619 179 
220008816A 
INJECTION-PUMP ASSEMBLY
K-3
Back to top