106971-2063 ZEXEL 9 400 618 684 BOSCH INJECTION-PUMP ASSEMBLY 9400618684 1069712063 me091900


106971-2063 INJECTION-PUMP ASSEMBLY
Rating:
41
Buy INJECTION-PUMP ASSEMBLY 106971-2063 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 618 684 9400618684
ZEXEL 106971-2063 1069712063
MITSUBISHI ME091900 me091900

Service parts 106971-2063 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106097-5580
3. GOVERNOR 105487-5282
4. SUPPLY PUMP 105237-1321
5. AUTOM. ADVANCE MECHANIS 105639-1210
6. COUPLING PLATE 105663-0550
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7971
11. Nozzle and Holder ME091276
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105030-4510
14. NOZZLE 105015-9440
15. NOZZLE SET

Include in #1:

106971-2063 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 618 684 9400618684
ZEXEL 106971-2063 1069712063
MITSUBISHI ME091900 me091900


Zexel num
Bosch num
Firm num
Name
106971-2063 
9 400 618 684 
ME091900  MITSUBISHI
INJECTION-PUMP ASSEMBLY
10DC11 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-8- 5-6-3-4- 9-10
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   72 71.5 72.5
Difference between angles 3
Cal 1-8
deg.   117 116.5 117.5
Difference between angles 4
Cal 1-5
deg.   144 143.5 144.5
Difference between angles 5
Cal 1-6
deg.   189 188.5 189.5
Difference between angles 6
Cal 1-3
deg.   216 215.5 216.5
Difference between angles 7
Cal 1-4
deg.   261 260.5 261.5
Difference between angles 8
Cal 1-9
deg.   288 287.5 288.5
Difference between angles 9
Cal 1-10
deg.   333 332.5 333.5
Injection quantity adjustment
Adjusting point   -
Rack position   10.7
Pump speed r/min   650 650 650
Each cylinder's injection qty mm3/st.   130 126.1 133.9
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.6+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   17 14.4 19.6
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(10.7)
Pump speed r/min   650 650 650
Average injection quantity mm3/st.   130 129 131
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(10.7)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   131.5 127.5 135.5
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   D
Rack position   11.4+-0. 1
Pump speed r/min   340 340 340
Average injection quantity mm3/st.   133 129 137
Fixing the lever   *
Remarks
Startup boost setting
 
Injection quantity adjustment_06
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   155 135 175
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   (750)
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1100
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106971-2063
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Tolerance for racks not indicated: +-0.05mm. (4)Deliver without the torque control spring operating. (5)Excess fuel setting for starting: SXL (N = N1) (6)Damper spring setting (7)When air cylinder is operating.
----------
SXL=11.4+-0.1mm N1=340r/min
----------

Speed control lever angle

Test data 106971-2063
F:Full speed I:Idle (1)- (2)Air cylinder's adjustable range (3)Pump speed = aa (4)Pump speed = bb (5)Pump speed cc
----------
aa=1200r/min bb=275r/min cc=800r/min
----------
a=(11deg) b=(11deg)+-5deg c=(22deg)+-5deg d=(7deg)+-5deg

0000000901

Test data 106971-2063
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=27deg+-3deg

Stop lever angle

Test data 106971-2063
S:Stop the pump. (1)Rack position = aa (2)Stopper bolt setting (3)Free (at delivery) (4)Drive side (5)Use the hole at R = bb
----------
aa=3.7-0.5mm bb=35mm
----------
a=10.5deg+-5deg b=57deg+7deg-5deg

0000001501 2-STAGE CHANGEOVER DEVICE

Test data 106971-2063
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------

0000001601 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325r/min Ra=5.7+-0.1mm
----------

Timing setting

Test data 106971-2063
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(40deg)




Have questions with 106971-2063?





Group cross 106971-2063 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 680 
ME090445 
INJECTION-PUMP ASSEMBLY
10DC9T2
9 400 618 681 
ME090924 
INJECTION-PUMP ASSEMBLY
E64X
9 400 618 682 
ME090925 
INJECTION-PUMP ASSEMBLY
10DC11
9 400 618 683 
ME091100 
INJECTION-PUMP ASSEMBLY
10DC9T2
F 01G 09U 0BT 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

F 01G 09U 0BU 
ME091684 
INJECTION-PUMP ASSEMBLY
10DC11
F 019 Z10 656 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

F 019 Z10 657 
ME091685 
INJECTION-PUMP ASSEMBLY
10DC11
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

106971-2063  
9 400 618 684 
ME091900 
INJECTION-PUMP ASSEMBLY
10DC11
F 01G 09U 0BV 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 685 
ME092073 
INJECTION-PUMP ASSEMBLY
10DC11
F 019 Z10 658 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 686 
ME092077 
INJECTION-PUMP ASSEMBLY
10DC11
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 687 
ME092107 
INJECTION-PUMP ASSEMBLY
10DC9T2
Back to top