Rating:
Information injection-pump assembly
BOSCH
F 019 Z20 171
f019z20171
ZEXEL
106681-4460
1066814460
NIIGATA-TEKKOU
75L47530A
75l47530a
Service parts 106681-4460 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
12.
Open Pre:MPa(Kqf/cm2)
25.5{260}
15.
NOZZLE SET
Include in #1:
106681-4460
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
F 019 Z20 171
f019z20171
ZEXEL
106681-4460
1066814460
NIIGATA-TEKKOU
75L47530A
75l47530a
Zexel num
Bosch num
Firm num
Name
F 019 Z20 171
75L47530A NIIGATA-TEKKOU
INJECTION-PUMP ASSEMBLY
DMF13HZA * K 14CA INJECTION PUMP ASSY PE6P,6PD PE
DMF13HZA * K 14CA INJECTION PUMP ASSY PE6P,6PD PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8250
Bosch type code
1 688 901 101
Nozzle
105780-0120
Bosch type code
1 688 901 990
Nozzle holder
105780-2190
Opening pressure
MPa
20.7
Opening pressure
kgf/cm2
211
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
134424-4120
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
255
255
255
Tester oil delivery pressure
kgf/cm2
2.6
2.6
2.6
RED3 control unit part number
407910-3
960
RED3 rack sensor specifications
mm
19
Direction of rotation (viewed from drive side)
Left L
Left L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left L
Left L
Injection order
1-4-2-6-
3-5
Pre-stroke
mm
3.2
3.15
3.25
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cal 1-4 deg. 60 59.5 60.5
Cal 1-4 deg. 60 59.5 60.5
Difference between angles 2
Cyl.1-2 deg. 120 119.5 120.5
Cyl.1-2 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cal 1-3 deg. 240 239.5 240.5
Cal 1-3 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-5 deg. 300 299.5 300.5
Cal 1-5 deg. 300 299.5 300.5
Injection quantity adjustment
Rack position
(14.3)
Vist
V
1.71
1.71
1.71
Pump speed
r/min
1050
1050
1050
Average injection quantity
mm3/st.
204
199
209
Max. variation between cylinders
%
0
-3
3
Basic
*
Injection quantity adjustment_02
Rack position
(5.6)
Vist
V
3.01
2.91
3.11
Pump speed
r/min
330
330
330
Average injection quantity
mm3/st.
18
16.5
19.5
Max. variation between cylinders
%
0
-8
8
Governor adjustment
Pump speed
r/min
390--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Governor adjustment_02
Pump speed
r/min
340
Advance angle
deg.
0.5
Governor adjustment_03
Pump speed
r/min
660
Advance angle
deg.
4
3.5
4.5
Remarks
Finish
Finish
Test data Ex:
Speed control lever angle
N:Pump normal
S:Stop the pump.
(1)Rack position = aa
(2)Rack position bb
----------
aa=18.2+0.3mm bb=1mm
----------
a=23.5deg+-5deg b=33.5deg+-5deg
----------
aa=18.2+0.3mm bb=1mm
----------
a=23.5deg+-5deg b=33.5deg+-5deg
0000000901
(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=16deg
----------
a=(5deg)
----------
aa=16deg
----------
a=(5deg)
Stop lever angle
(Rs) rack sensor specifications
(C/U) control unit part number
(V) Rack sensor output voltage
(R) Rack position (mm)
1. Confirming governor output characteristics (rack 19 mm, span 6 mm)
(1)When the output voltages of the rack sensor are V1 and V2, check that the rack positions R1 and R2 in the table above are satisfied.
----------
----------
----------
----------