104748-2570 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1047482570


104748-2570 INJECTION-PUMP ASSEMBLY
Rating:
60
Buy INJECTION-PUMP ASSEMBLY 104748-2570 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 104748-2570 1047482570

Cross reference number

ZEXEL 104748-2570 1047482570


Zexel num
Bosch num
Firm num
Name
104748-2570 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113orSAEJ967d
Test oil temperature degC   45 45 50
Nozzle   105000-2010
Bosch type code   NP-DN12SD12TT
Nozzle holder   105780-2080
Opening pressure MPa   14.7 14.7 15.19
Opening pressure kgf/cm2   150 150 155
Injection pipe
Inside diameter - outside diameter - length (mm)
mm   2-6-840
Transfer pump pressure kPa   20 20 20
Transfer pump pressure kgf/cm2   0.2 0.2 0.2
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   27.6 27.1 28.1
Difference in delivery mm3/st.   2
Basic   *
Injection timing adjustment_02
Pump speed r/min   2700 2700 2700
Average injection quantity mm3/st.   14.8 11.3 18.3
Injection timing adjustment_03
Pump speed r/min   2500 2500 2500
Average injection quantity mm3/st.   26.3 24.3 28.3
Injection timing adjustment_04
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   27.6 26.6 28.6
Injection timing adjustment_05
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   26.8 24.8 28.8
Injection quantity adjustment
Pump speed r/min   2700 2700 2700
Average injection quantity mm3/st.   14.8 11.8 17.8
Difference in delivery mm3/st.   4.5
Basic   *
Injection quantity adjustment_02
Pump speed r/min   2900 2900 2900
Average injection quantity mm3/st.   6
Governor adjustment
Pump speed r/min   360 360 360
Average injection quantity mm3/st.   8.1 6.6 9.6
Difference in delivery mm3/st.   2
Basic   *
Governor adjustment_02
Pump speed r/min   360 360 360
Average injection quantity mm3/st.   8.1 6.1 10.1
Governor adjustment_03
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   5
Boost compensator adjustment
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   15.3 10.8 19.8
Remarks
From idle
 
Timer adjustment
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   55.3 50.3 60.3
Basic   *
Remarks
Refer to additional devices.
 
Speed control lever angle
Pump speed r/min   360 360 360
Average injection quantity mm3/st.   0 0 0
Remarks
Magnet OFF
 
0000000901
Pump speed r/min   1200 1200 1200
Overflow quantity cm3/min   348 216 480
Stop lever angle
Pump speed r/min   1200 1200 1200
Pressure kPa   372.5 343 402
Pressure kgf/cm2   3.8 3.5 4.1
Basic   *
Stop lever angle_02
Pump speed r/min   1200 1200 1200
Pressure kPa   372.5 333 412
Pressure kgf/cm2   3.8 3.4 4.2
Stop lever angle_03
Pump speed r/min   1800 1800 1800
Pressure kPa   510 471 549
Pressure kgf/cm2   5.2 4.8 5.6
Stop lever angle_04
Pump speed r/min   2500 2500 2500
Pressure kPa   667 628 706
Pressure kgf/cm2   6.8 6.4 7.2
0000001101
Pump speed r/min   1200 1200 1200
Timer stroke mm   2.9 2.6 3.2
Basic   *
_02
Pump speed r/min   1200 1200 1200
Timer stroke mm   2.9 2.5 3.3
_03
Pump speed r/min   1800 1800 1800
Timer stroke mm   5.4 5 5.8
_04
Pump speed r/min   2500 2500 2500
Timer stroke mm   8.15 7.7 8.6
0000001201
Max. applied voltage V   8 8 8
Test voltage V   13 12 14
0000001401
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   16.5 15.5 17.5
Timer stroke variation dT mm   0.6 0.4 0.8
Basic   *
Timing setting
K dimension mm   3.3 3.2 3.4
KF dimension mm   5.8 5.7 5.9
MS dimension mm   1.6 1.5 1.7
Control lever angle alpha deg.   0 -1 1
Control lever angle beta deg.   42 37 47
Control lever angle gamma deg.   11 10.5 11.5

Test data Ex:

0000001801 CONTROL LEVER ANGLE

Test data 104748-2570
Control lever angle measurement 1. Measure the dimension L from the lever tip to the flange face (A). 2. Measure the lever angle from the pin hole R (plate). (B): lever angle measuring hole Alpha = a beta: b
----------
R=44mm L=15.4~18.1mm
----------
R=44mm L=15.4~18.1mm a=1~-1deg b=37~47deg

0000001901 STARTING I/Q ADJUSTMENT

Test data 104748-2570
Starting injection quantity adjustment Adjust adjusting bolt so that the starting injection quantity is within the standard. Fix using nut. (A): Lock nut. (B): Stopping lever (C): Adjustment bolt
----------

----------
L=5.9~8.2mm

0000002001 W-CSD ADJUSTMENT

Test data 104748-2570
Adjustment of the W-CSD 1. Timer advance adjustment (refer to Fig 1 [O], 3 [Q]). (1)Determine the timer advance angle from the graph in Fig. 3 (Q). (2)(1) Adjust with the screw (A) so that the timer advance angle determined in the item (1) is obtained. 2. Setting the intermediate lever position (refer to fig 1 and fig 2) (1)Insert a block gauge L1 between the idling set screw (G) and the control lever (F). (2)Align the intermediate lever (D) with the aligning line (J) and position it perpendicularly. 3. W-CSD lever adjustment [refer to fig 1 (O) and fig 2 (P)] (1)After completing (2) above, remove the block gauge L2. (2)Insert a block gauge (I) L3 determined from the graph (L-theta) in figure 3 (Q) between the idling set screw (G) and the control lever (F). (3)Fix screw (B) so that the W-CSD lever (C)'s roller contacts the intermediate lever (D). Fix using the nut. Note: The temperature of the wax at adjustment must not exceed a. X:Temperature theta (deg C) Y1:Timer stroke TA (mm) Y2:Control lever L dimension (mm; control lever position) K:Vertical position M:TA-theta line 10 <= theta (deg C) <= 20: TA = -0.0355 theta + 1.995 20 <= theta (deg C) <= 57: TA = -0.03515 theta + 1.988 N:L-theta graph theta (deg C) <= 10: L = 4.6 10 < theta (deg C) <= 20: L = -0.17theta + 6.3 20 < theta (deg C) <= 28.5: L = -0.235 theta + 7.6 28.5 < theta (deg C) <= 36: L = -0.012 theta + 4.32
----------
L1=L=2.9+-0.05mm L2=2.9mm L3=L+-0.05mm a=30degC
----------

0000002101 POTENTIOMETER ADJUSTMENT

Test data 104748-2570
Adjustment of the potentiometer At pump speed N = N1 r/min and with the control lever angle at a from the idle position (corresponding to a shim thickness of L mm), convert the injection quantity obtained to a voltage value using the graph and adjust the potentiometer. Vi:Applied voltage E = conversion expression Vo = output voltage Q = injection quantity
----------
N1=700r/min a=12+-0.5deg L=-mm Vi=10V
----------
J+-0.03=0.1352Q+2.42(V) Vi=10V




Have questions with 104748-2570?





Group cross 104748-2570 ZEXEL

Nissan 

9 460 614 653 
1670080A05 
INJECTION-PUMP ASSEMBLY
CD17
9 460 614 654 
1670054A01 
INJECTION-PUMP ASSEMBLY
CD17
 
 
INJECTION-PUMP ASSEMBLY
CD17
9 460 614 655 
1670054A02 
INJECTION-PUMP ASSEMBLY
CD17
 
 
INJECTION-PUMP ASSEMBLY
CD17
9 460 613 024 
1670079A02 
INJECTION-PUMP ASSEMBLY
CD17
 
 
INJECTION-PUMP ASSEMBLY
CD17
9 460 613 025 
1670079A07 
INJECTION-PUMP ASSEMBLY
CD17
104748-2570  
 
 
INJECTION-PUMP ASSEMBLY
9 460 613 026 
 
INJECTION-PUMP ASSEMBLY

Nissan 

 
1670079A12 
INJECTION-PUMP ASSEMBLY
CD17
9 460 613 027 
1670079A20 
INJECTION-PUMP ASSEMBLY
CD17
9 460 610 763 
16700K6700 
INJECTION-PUMP ASSEMBLY
CD17
9 460 610 764 
16700K6701 
INJECTION-PUMP ASSEMBLY
CD17
Back to top