101402-2430 ZEXEL 9 400 613 326 BOSCH INJECTION-PUMP ASSEMBLY 9400613326 1014022430 220206330a


101402-2430 INJECTION-PUMP ASSEMBLY
Rating:
54
Buy INJECTION-PUMP ASSEMBLY 101402-2430 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 613 326 9400613326
ZEXEL 101402-2430 1014022430
HINO 220206330A 220206330a

Service parts 101402-2430 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101040-9621
3. GOVERNOR 105401-1370
4. SUPPLY PUMP 105220-5540
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156637-9520
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105110-5140
11. Nozzle and Holder 23600-2150
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105041-5090
14. NOZZLE 105015-8360
15. NOZZLE SET

Include in #1:

101402-2430 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 613 326 9400613326
ZEXEL 101402-2430 1014022430
HINO 220206330A 220206330a


Zexel num
Bosch num
Firm num
Name
101402-2430 
9 400 613 326 
220206330A  HINO
INJECTION-PUMP ASSEMBLY
W04C-TI K 14BD INJECTION PUMP ASSY PE4AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5720
Overflow valve opening pressure kPa   255 255 255
Overflow valve opening pressure kgf/cm2   2.6 2.6 2.6
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   4.4 4.35 4.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   12.2
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   143 141 145
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Boost pressure kPa   80 80
Boost pressure mmHg   600 600
Injection quantity adjustment_02
Adjusting point   B
Rack position   7.1+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   16.5 15 18
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   700 700 700
Rack position   R1-2.8
Boost pressure kPa   12 9.3 14.7
Boost pressure mmHg   90 70 110
Boost compensator adjustment_02
Pump speed r/min   700 700 700
Rack position   R1(12.2)
Boost pressure kPa   66.7 66.7 66.7
Boost pressure mmHg   500 500 500

Test data Ex:

Governor adjustment

Test data 101402-2430
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Set idle sub-spring (4)Boost compensator stroke (5)Main spring setting
----------
K=8
----------

Speed control lever angle

Test data 101402-2430
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=24deg+-5deg b=26deg+-5deg

Stop lever angle

Test data 101402-2430
N:Pump normal S:Stop the pump. (1)- (2)Pump speed aa and rack position bb (to be sealed at delivery) (3)Use the hole above R = cc (4)Stopper bolt setting
----------
aa=0r/min bb=1-0.5mm cc=25mm
----------
a=21deg+-5deg b=(55deg)

0000001501 TAMPER PROOF

Test data 101402-2430
Tamperproofing-equipped boost compensator cover installation procedure (A): After adjusting the boost compensator, assemble then tighten the bolts to remove the heads. (B): Specified torque (1)Before adjusting the governor and the boost compensator, tighten the screw to the specified torque. (Tightening torque T = T1 maximum) (2)After adjusting the governor and the boost compensator, tighten to the specified torque to break off the bolt heads. (Tightening torque T = T2)
----------
T1=2.5N-m(0.25kgf-m) T2=2.9~4.4N-m(0.3~0.45kgf-m)
----------

Timing setting

Test data 101402-2430
(1)Pump vertical direction (2)Position of gear's standard threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(70deg)




Have questions with 101402-2430?





Group cross 101402-2430 ZEXEL

Hino 

9 400 613 871 
220206280A 
INJECTION-PUMP ASSEMBLY
W04D
F 019 Z10 935 
220206280B 
INJECTION-PUMP ASSEMBLY
W04D
9 400 612 687 
220206310A 
INJECTION-PUMP ASSEMBLY
W04D
F 019 Z10 936 
220206310B 
INJECTION-PUMP ASSEMBLY
W04D
F 019 Z10 794 
220206510A 
INJECTION-PUMP ASSEMBLY
W04D
F 01G 09U 1GE 
220206510B 
INJECTION-PUMP ASSEMBLY
W04D
 
22010E0570 
INJECTION-PUMP ASSEMBLY
W04D
9 400 612 918 
220206320A 
INJECTION-PUMP ASSEMBLY
W04D-T
F 019 Z10 937 
220206320B 
INJECTION-PUMP ASSEMBLY
W04D-T
101402-2430  
9 400 613 326 
220206330A 
INJECTION-PUMP ASSEMBLY
W04C-TI
9 400 613 872 
220206360A 
INJECTION-PUMP ASSEMBLY
W04D-TI
F 019 Z10 938 
220206360B 
INJECTION-PUMP ASSEMBLY
W04D-TI
9 400 613 098 
220206370A 
INJECTION-PUMP ASSEMBLY
W04D-T
 
220206370B 
INJECTION-PUMP ASSEMBLY
W04D-T
9 400 619 935 
220206370C 
INJECTION-PUMP ASSEMBLY
W04D-T
9 400 613 873 
220206440A 
INJECTION-PUMP ASSEMBLY
W04D
 
 
INJECTION-PUMP ASSEMBLY
W04D
 
220206510A 
INJECTION-PUMP ASSEMBLY
W04D
 
 
INJECTION-PUMP ASSEMBLY
W04D-T

Hino 

 
220206520A 
INJECTION-PUMP ASSEMBLY
W04D-T
Back to top