108822-3119 ZEXEL 9 400 619 350 BOSCH INJECTION-PUMP ASSEMBLY 9400619350 1088223119 220009126a


108822-3119 INJECTION-PUMP ASSEMBLY
Rating:
34
Buy INJECTION-PUMP ASSEMBLY 108822-3119 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 619 350 9400619350
ZEXEL 108822-3119 1088223119
HINO 220009126A 220009126a

Cross reference number

BOSCH 9 400 619 350 9400619350
ZEXEL 108822-3119 1088223119
HINO 220009126A 220009126a


Zexel num
Bosch num
Firm num
Name
108822-3119 
9 400 619 350 
220009126A  HINO
INJECTION-PUMP ASSEMBLY
F21C-B * K 14CK TICS HD-TI8M TICS

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   134424-4120
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   41
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-8-6-2- 7-5-4-3
Pre-stroke mm   7.2 7.17 7.23
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-8
deg.   45 44.75 45.25
Difference between angles 2
Cal 1-6
deg.   90 89.75 90.25
Difference between angles 3
Cyl.1-2
deg.   135 134.75 135.25
Difference between angles 4
Cal 1-7
deg.   180 179.75 180.25
Difference between angles 5
Cal 1-5
deg.   225 224.75 225.25
Difference between angles 6
Cal 1-4
deg.   270 269.75 270.25
Difference between angles 7
Cal 1-3
deg.   315 314.75 315.25
Injection quantity adjustment
Adjusting point   -
Rack position   13.9
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   148 145 151
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
PS407980-224* V   2.2+-0.0 1
PS407980-224* mm   4.8+-0.0 5
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   7.9+-0.5
Pump speed r/min   375 375 375
Average injection quantity mm3/st.   14.3 11.3 17.3
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   7.1+-0.0 3
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Refer to items regarding the pre-stroke actuator
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(13.9)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   148 146 150
Basic   *
Fixing the lever   *
PS407980-224* V   2.2+-0.0 1
PS407980-224* mm   4.8+-0.0 5
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.95
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   136 130 142
Fixing the lever   *
PS407980-224* V   2.2+-0.0 1
PS407980-224* mm   4.8+-0.0 5
0000001601
Pre-stroke mm   7.2 7.17 7.23
Remarks
When the timing sleeve is pushed up
 
_02
Connector angle deg.   11.5 11 12
Remarks
When the eccentric pin is tightened
 
_03
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   3.2 3.15 3.25
Output voltage V   2.95 2.94 2.96
Adjustment   *
_04
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   7.2 7.17 7.23
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_05
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Governor adjustment

Test data 108822-3119
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Set stop lever before governor adjustment. [When setting stop lever after governor adjustment, confirm that point B (Ra) can be obtained at full setting.] (4)Stop lever's normal position setting: equivalent to RA (5)Damper spring setting
----------
T1=AD11 Ra=R1+0.95mm RA=(17)mm
----------

Speed control lever angle

Test data 108822-3119
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=88mm
----------
a=12deg+-5deg b=(34.5deg)+-3deg

Stop lever angle

Test data 108822-3119
N:Pump normal S:Stop the pump. (1)Set the stopper bolt at rack position = aa (speed = bb) (2)Set the stopper bolt at rack position = cc (speed = dd). (3)At pin above R = ee
----------
aa=0.5+-0.3mm bb=0r/min cc=(17)mm dd=0r/min ee=35mm
----------
a=15deg+-5deg b=35deg+-5deg

0000001301

Test data 108822-3119
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)At the No 1 cylinder's beginning of injection position, stamp an aligning mark on the damper to align with the pointer's groove. (4)Damper (5)Pointer (6)Pre-stroke: aa (7)-
----------
aa=7.2+-0.03mm
----------
a=(80deg)

0000001901

Test data 108822-3119
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000002201 RACK SENSOR

Test data 108822-3119
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1100r/min Ra=R1(13.9)+0.95mm
----------

0000002301 AIR CYLINDER

Test data 108822-3119
(A): Speed lever (B): Adjusting bolt (C): Air cylinder (D): Locknut Within the speed lever's operating range, temporarily tighten the adjusting bolt so that the air cylinder adjusting bolt does not contact the air cylinder (clearance L). (Air cylinder adjustment not necessary.)
----------

----------




Have questions with 108822-3119?





Group cross 108822-3119 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
9 400 619 897 
 
INJECTION-PUMP ASSEMBLY

Hino 

 
220009121A 
INJECTION-PUMP ASSEMBLY
F-4
F 01G 09U 0GP 
220009122A 
INJECTION-PUMP ASSEMBLY
F-4
F 01G 09U 0GR 
220009123A 
INJECTION-PUMP ASSEMBLY
F-4
F 019 Z20 432 
 
INJECTION-PUMP ASSEMBLY

Hino 

 
220009124A 
INJECTION-PUMP ASSEMBLY
F-4
 
220009125A 
INJECTION-PUMP ASSEMBLY
F-4
F 01G 09U 0GS 
 
INJECTION-PUMP ASSEMBLY

Hino 

108822-3119  
9 400 619 350 
220009126A 
INJECTION-PUMP ASSEMBLY
F21C-B
Back to top