108822-2760 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1088222760


108822-2760 INJECTION-PUMP ASSEMBLY
Rating:
33
Buy INJECTION-PUMP ASSEMBLY 108822-2760 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 108822-2760 1088222760

Service parts 108822-2760 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 108082-3361
3. GOVERNOR 105923-3660
4. SUPPLY PUMP 105237-5030
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0990
7. COUPLING PLATE
10. NOZZLE AND HOLDER ASSY 105110-7391
11. Nozzle and Holder ME161933
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/24.5{250}
13. NOZZLE-HOLDER 105041-4101
14. NOZZLE
15. NOZZLE SET 105019-0380

Include in #1:

108822-2760 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 108822-2760 1088222760


Zexel num
Bosch num
Firm num
Name
108822-2760 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-0220
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   42
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   8.5 8.47 8.53
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.75 45.25
Difference between angles 2
Cal 1-7
deg.   90 89.75 90.25
Difference between angles 3
Cal 1-3
deg.   135 134.75 135.25
Difference between angles 4
Cal 1-4
deg.   180 179.75 180.25
Difference between angles 5
Cal 1-5
deg.   225 224.75 225.25
Difference between angles 6
Cal 1-6
deg.   270 269.75 270.25
Difference between angles 7
Cal 1-8
deg.   315 314.75 315.25
Injection quantity adjustment
Adjusting point   -
Rack position   14.5
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   151.5 149.9 153.1
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
PS407980-224* V   2.45+-0. 01
PS407980-224* mm   6.1+-0.0 5
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   9+-0.5
Pump speed r/min   355 355 355
Average injection quantity mm3/st.   20.5 18.5 22.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   8.4+-0.0 3
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Refer to items regarding the pre-stroke actuator
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(14.5)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   151.5 150.5 152.5
Basic   *
Fixing the lever   *
PS407980-224* V   2.45+-0. 01
PS407980-224* mm   6.1+-0.0 5
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+1.35
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   151 147 155
Fixing the lever   *
PS407980-224* V   2.45+-0. 01
PS407980-224* mm   6.1+-0.0 5
0000001601
Pre-stroke mm   8.5 8.47 8.53
Remarks
When the timing sleeve is pushed up
 
_02
Connector angle deg.   8.5 8 9
Remarks
When the eccentric pin is tightened
 
_03
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   6.1 6.05 6.15
Output voltage V   2.45 2.44 2.46
Adjustment   *
_04
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   8.5 8.47 8.53
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_05
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.5
Output voltage V   3 2.98 3
Confirmation   *
_06
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Governor adjustment

Test data 108822-2760
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Damper spring setting
----------
T1=AD96
----------

Speed control lever angle

Test data 108822-2760
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H' (3)Viewed from feed pump side.
----------
aa=37.5mm
----------
a=32deg+-5deg b=31deg+-3deg

Stop lever angle

Test data 108822-2760
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa (2)Set the stopper bolt so that speed = bb and rack position = cc. (Confirm non-injection.) (3)Normal engine position (Rack position corresponding to dd)
----------
aa=54mm bb=1100r/min cc=1.5+-0.3mm dd=20mm
----------
a=(39deg) b=35.5deg+-5deg c=45deg+-5deg

0000001301

Test data 108822-2760
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)At the No 1 cylinder's beginning of injection position, stamp an aligning mark on the damper to align with the pointer's groove. (4)Damper (5)Pointer (6)B.T.D.C.: aa (7)Pre-stroke: bb
----------
aa=6deg bb=8.5+-0.03mm
----------
a=(45deg) b=(44deg)

0000001901

Test data 108822-2760
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000002201 RACK SENSOR

Test data 108822-2760
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1100r/min Ra=R1(14.5)+1.35mm
----------




Have questions with 108822-2760?





Group cross 108822-2760 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 319 
ME094953 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 320 
ME094954 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 321 
ME094955 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 322 
ME094956 
INJECTION-PUMP ASSEMBLY
8DC11
F 01G 09U 0GE 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 323 
ME163517 
INJECTION-PUMP ASSEMBLY
8M21
F 01G 09U 0GF 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 324 
ME163518 
INJECTION-PUMP ASSEMBLY
8M21
108822-2760  
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 325 
ME163603 
INJECTION-PUMP ASSEMBLY
8M21
9 400 619 326 
ME095194 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 327 
ME095195 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 328 
ME095196 
INJECTION-PUMP ASSEMBLY
8DC11
Back to top