Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-0220
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
PS/ACT control unit part no.   407980-2 24*
Digi switch no.   42
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   8.5 8.47 8.53
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.75 45.25
Difference between angles 2
Cal 1-7
deg.   90 89.75 90.25
Difference between angles 3
Cal 1-3
deg.   135 134.75 135.25
Difference between angles 4
Cal 1-4
deg.   180 179.75 180.25
Difference between angles 5
Cal 1-5
deg.   225 224.75 225.25
Difference between angles 6
Cal 1-6
deg.   270 269.75 270.25
Difference between angles 7
Cal 1-8
deg.   315 314.75 315.25
Injection quantity adjustment
Adjusting point   -
Rack position   13.5
Pump speed r/min   650 650 650
Average injection quantity mm3/st.   145.5 143.9 147.1
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
PS407980-224* V   2.45+-0. 01
PS407980-224* mm   6.1+-0.0 5
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   9+-0.5
Pump speed r/min   290 290 290
Average injection quantity mm3/st.   23 21 25
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
PS407980-224* V   V1+0.05+ -0.01
PS407980-224* mm   8.4+-0.0 3
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Refer to items regarding the pre-stroke actuator
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(13.5)
Pump speed r/min   650 650 650
Average injection quantity mm3/st.   145.5 144.5 146.5
Basic   *
Fixing the lever   *
PS407980-224* V   2.45+-0. 01
PS407980-224* mm   6.1+-0.0 5
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+1.7
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   146.5 142.5 150.5
Fixing the lever   *
PS407980-224* V   2.45+-0. 01
PS407980-224* mm   6.1+-0.0 5
0000001601
Pre-stroke mm   8.5 8.47 8.53
Remarks
When the timing sleeve is pushed up
 
_02
Connector angle deg.   8.5 8 9
Remarks
When the eccentric pin is tightened
 
_03
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   6.1 6.05 6.15
Output voltage V   2.45 2.44 2.46
Adjustment   *
_04
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   8.5 8.47 8.53
Output voltage V   1.2 1 1.4
Confirmation   *
Remarks
Output voltage V1
 
_05
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Pre-stroke mm   5.5
Output voltage V   3 2.98 3
Confirmation   *
_06
Supply voltage V   24 23.5 24.5
Ambient temperature degC   23 18 28
Output voltage V   3.05 3.05
Confirmation of operating range   *

Test data Ex:

Governor adjustment

Test data 108822-2090
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Damper spring setting
----------
T1=AC00
----------

Speed control lever angle

Test data 108822-2090
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H' (3)Viewed from feed pump side.
----------
aa=37.5mm
----------
a=30deg+-5deg b=30.5deg+-3deg

Stop lever angle

Test data 108822-2090
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa (2)Set the stopper bolt so that speed = bb and rack position = cc. (Confirm non-injection.) (3)Normal engine position (equivalent to R = dd).
----------
aa=31.5mm bb=1100r/min cc=4+-0.3mm dd=18mm
----------
a=(31deg) b=13deg+-5deg c=41deg+-5deg

0000001301

Test data 108822-2090
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)At the No 1 cylinder's beginning of injection position, stamp an aligning mark on the damper to align with the pointer's groove. (4)Damper (5)Pointer (6)B.T.D.C.: aa (7)Pre-stroke: bb
----------
aa=6deg bb=8.5+-0.03mm
----------
a=(50deg) b=(44deg)

0000001901

Test data 108822-2090
A:Sealing position B:Pre-stroke actuator 1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully counterclockwise (viewed from the drive side). Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m) 2. Move the actuator in the clockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it. Tightening torque: 7^9 N.m (0.7^0.9 kgf.m) 3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------

----------

0000002201 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325r/min Ra=9+-0.1mm
----------

0000002301 RACK SENSOR

Test data 108822-2090
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1100r/min Ra=R1(13.5)+1.7mm
----------




Have questions with 108822-2090?





Group cross 108822-2090 ZEXEL

9 400 619 820 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 251 
ME161305 
INJECTION-PUMP ASSEMBLY
E74X
9 400 619 895 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 252 
ME161306 
INJECTION-PUMP ASSEMBLY
E74X
9 400 619 253 
ME093391 
INJECTION-PUMP ASSEMBLY
8DC11
9 400 619 790 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 254 
ME093390 
INJECTION-PUMP ASSEMBLY
8DC11
9 400 619 255 
ME161285 
INJECTION-PUMP ASSEMBLY
E74X
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 256 
ME093409 
INJECTION-PUMP ASSEMBLY
8DC11
F 019 Z20 373 
ME354496 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 630 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 257 
ME161418 
INJECTION-PUMP ASSEMBLY
E74X
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 896 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 258 
ME161711 
INJECTION-PUMP ASSEMBLY
8M21
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 611 130 
ME093670 
INJECTION-PUMP ASSEMBLY
8DC11
108822-2090  
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 619 259 
ME161706 
INJECTION-PUMP ASSEMBLY
E74X
Back to top