Rating:
Information injection-pump assembly
ZEXEL
108622-3231
1086223231
HINO
220801611A
220801611a
Service parts 108622-3231 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
9.
_
11.
Nozzle and Holder
23600-2610
12.
Open Pre:MPa(Kqf/cm2)
16.7{170}/27.5{280}
14.
NOZZLE
Include in #1:
108622-3231
as INJECTION-PUMP ASSEMBLY
Cross reference number
ZEXEL
108622-3231
1086223231
HINO
220801611A
220801611a
Zexel num
Bosch num
Firm num
Name
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
134424-1520
Overflow valve opening pressure
kPa
162
147
177
Overflow valve opening pressure
kgf/cm2
1.65
1.5
1.8
Tester oil delivery pressure
kPa
255
255
255
Tester oil delivery pressure
kgf/cm2
2.6
2.6
2.6
PS/ACT control unit part no.
407980-2
24*
Digi switch no.
21
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-4-2-6-
3-5
Pre-stroke
mm
6.4
6.37
6.43
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-4 deg. 60 59.75 60.25
Cal 1-4 deg. 60 59.75 60.25
Difference between angles 2
Cyl.1-2 deg. 120 119.75 120.25
Cyl.1-2 deg. 120 119.75 120.25
Difference between angles 3
Cal 1-6 deg. 180 179.75 180.25
Cal 1-6 deg. 180 179.75 180.25
Difference between angles 4
Cal 1-3 deg. 240 239.75 240.25
Cal 1-3 deg. 240 239.75 240.25
Difference between angles 5
Cal 1-5 deg. 300 299.75 300.25
Cal 1-5 deg. 300 299.75 300.25
Injection quantity adjustment
Adjusting point
A
Rack position
9
Pump speed
r/min
700
700
700
Average injection quantity
mm3/st.
150.5
148.5
152.5
Max. variation between cylinders
%
0
-2
2
Basic
*
Fixing the lever
*
Boost pressure
kPa
43.3
43.3
Boost pressure
mmHg
325
325
PS407980-224*
V
2.62+-0.
01
PS407980-224*
mm
4+-0.05
Injection quantity adjustment_02
Adjusting point
B
Rack position
8.9
Pump speed
r/min
500
500
500
Average injection quantity
mm3/st.
156
153
159
Fixing the lever
*
Boost pressure
kPa
43.3
43.3
Boost pressure
mmHg
325
325
PS407980-224*
V
2.62+-0.
01
PS407980-224*
mm
4+-0.05
Injection quantity adjustment_03
Adjusting point
D
Rack position
9.6
Pump speed
r/min
1075
1075
1075
Average injection quantity
mm3/st.
153.5
150.5
156.5
Fixing the lever
*
Boost pressure
kPa
43.3
43.3
Boost pressure
mmHg
325
325
PS407980-224*
V
2.62+-0.
01
PS407980-224*
mm
4+-0.05
Injection quantity adjustment_04
Adjusting point
E
Rack position
8.5
Pump speed
r/min
1200
1200
1200
Average injection quantity
mm3/st.
126
123
129
Fixing the lever
*
Boost pressure
kPa
43.3
43.3
Boost pressure
mmHg
325
325
PS407980-224*
V
2.62+-0.
01
PS407980-224*
mm
4+-0.05
Injection quantity adjustment_05
Adjusting point
F
Rack position
-
Pump speed
r/min
300
300
300
Average injection quantity
mm3/st.
184.5
179.5
189.5
Fixing the lever
*
Boost pressure
kPa
43.3
43.3
Boost pressure
mmHg
325
325
Rack limit
*
PS407980-224*
V
2.62+-0.
01
PS407980-224*
mm
4+-0.05
Injection quantity adjustment_06
Adjusting point
G
Rack position
4+-0.5
Pump speed
r/min
250
250
250
Average injection quantity
mm3/st.
9.5
6.5
12.5
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
PS407980-224*
V
V1+0.05+
-0.01
PS407980-224*
mm
6.3+-0.0
3
Remarks
Refer to items regarding the pre-stroke actuator
Refer to items regarding the pre-stroke actuator
Injection quantity adjustment_07
Adjusting point
H
Rack position
7.2
Pump speed
r/min
400
400
400
Average injection quantity
mm3/st.
97.5
94.5
100.5
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
PS407980-224*
V
2.62+-0.
01
PS407980-224*
mm
4+-0.05
Injection quantity adjustment_08
Adjusting point
I
Rack position
-
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
125
125
145
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
PS407980-224*
V
2.62+-0.
01
PS407980-224*
mm
4+-0.05
Boost compensator adjustment
Pump speed
r/min
500
500
500
Rack position
7.2
Boost pressure
kPa
9.3
7.3
9.3
Boost pressure
mmHg
70
55
70
Boost compensator adjustment_02
Pump speed
r/min
500
500
500
Rack position
8.9
Boost pressure
kPa
30
30
30
Boost pressure
mmHg
225
225
225
0000001601
Pre-stroke
mm
6.4
6.37
6.43
Remarks
When the timing sleeve is pushed up
When the timing sleeve is pushed up
_02
Connector angle
deg.
5
4.5
5.5
Remarks
When the eccentric pin is tightened
When the eccentric pin is tightened
_03
Supply voltage
V
24
23.5
24.5
Ambient temperature
degC
23
18
28
Pre-stroke
mm
4
3.95
4.05
Output voltage
V
2.62
2.61
2.63
Adjustment
*
_04
Supply voltage
V
24
23.5
24.5
Ambient temperature
degC
23
18
28
Pre-stroke
mm
6.4
6.37
6.43
Output voltage
V
1.2
1
1.4
Confirmation
*
Remarks
Output voltage V1
Output voltage V1
_05
Supply voltage
V
24
23.5
24.5
Ambient temperature
degC
23
18
28
Pre-stroke
mm
3.4
Output voltage
V
3
2.98
3
Confirmation
*
_06
Supply voltage
V
24
23.5
24.5
Ambient temperature
degC
23
18
28
Output voltage
V
3.05
3.05
Confirmation of operating range
*
Test data Ex:
Governor adjustment
N:Pump speed
R:Rack position (mm)
(1)Tolerance for racks not indicated: +-0.05mm.
(2)Stop lever setting: R1
(3)RACK LIMIT
(4)Boost compensator stroke: BCL
(5)Damper spring setting
(6)Variable speed specification: idling adjustment
(7)Main spring setting
(8)Set idle at point K (N = N1, R = R2) and confirm that the injection quantity does not exceed Q1 at point J (N = N2). The prestroke at this time must be Pr1 (Pv1).
************
----------
R1=12.5+0.2mm BCL=1.7+-0.1mm N1=350r/min R2=4mm N2=1075r/min Q1=3mm3/st Pr1=4+-0.05mm Pv1=2.62+-0.01V
----------
----------
R1=12.5+0.2mm BCL=1.7+-0.1mm N1=350r/min R2=4mm N2=1075r/min Q1=3mm3/st Pr1=4+-0.05mm Pv1=2.62+-0.01V
----------
Speed control lever angle
F:Full speed
I:Idle
(1)Stopper bolt setting
(2)Use the hole at R = aa
(3)Stopper bolt setting
----------
aa=130mm
----------
a=7deg+-5deg b=(16deg)+-5deg
----------
aa=130mm
----------
a=7deg+-5deg b=(16deg)+-5deg
0000000901
F:Full load
I:Idle
(1)Stopper bolt setting
(2)Use the hole at R = aa
----------
aa=56mm
----------
a=25deg+-5deg b=31deg+-3deg
----------
aa=56mm
----------
a=25deg+-5deg b=31deg+-3deg
Stop lever angle
N:Pump normal
S:Stop the pump.
(1)Use the hole at R = aa
(2)Set the rack position at bb before adjusting the governor
(3)Set the stopper screw. (After setting, apply paint.)
----------
aa=33mm bb=12.5+0.2mm
----------
a=30deg+-5deg b=42deg+-5deg
----------
aa=33mm bb=12.5+0.2mm
----------
a=30deg+-5deg b=42deg+-5deg
0000001201
(1)Variable speed specification
(2)Minimum - maximum speed specification
(3)Use the hole at R = aa
----------
aa=150mm
----------
a=(16.5deg)+-5deg b=(35deg)
----------
aa=150mm
----------
a=(16.5deg)+-5deg b=(35deg)
0000001301
(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)Pre-stroke: aa
(4)-
----------
aa=6.4+-0.03mm
----------
a=(40deg)
----------
aa=6.4+-0.03mm
----------
a=(40deg)
0000001901
(A): Pre-stroke actuator
(B): Stamp housings A and B at the same time.
(C): Stamping range
1. When installing the pre-stroke actuator on the pump, first tighten the installation bolts loosely, then move the actuator fully clockwise (viewed from the drive side).
Temporary tightening torque: 1 - 1.5 N.m (0.1 - 0.15 kgf.m)
2. Move the actuator in the counterclockwise direction when viewed from the drive side, and adjust so that it becomes the adjustment point of the adjustment value. Then tighten it.
Tightening torque: 7^9 N.m (0.7^0.9 kgf.m)
3. After prestroke actuator installation adjustment, simultaneously stamp both the actuator side and housing side.
----------
----------
----------
----------
0000002201 RACK SENSOR
(VR) measurement voltage
(I) Part number of the control unit
(G) Apply red paint.
(H): End surface of the pump
Adjustment of the rack sensor (-0720)
1. Rack limit adjustment
(1)After mounting the joint (B), select the shim (D) so that the rack position is in the rack limit position.
(2)Install the rod (E) to the block (C).
(3)At the rack limit, set the distance between the pump end face and the rod (E) to L1.
2. Rack sensor
(1)Screw in the bobbin (A) until it contacts the joint (B).
(2)Fix the speed control lever at the full side and set the pump speed at N1.
(3)Adjust the depth that the bobbin (A) is screwed in so that the control unit's rack sensor output voltage is VR+-0.01 (V), then tighten the nut (F). (If equipped with a boost compensator, perform with boost pressure applied.)
(4)Apply red paint to both the joint (B) and the nut (F) join, and the joint (B) and the pump join. Output voltage VR +-0.01(V), speed N1, rack position Ra, rack sensor supply voltage 5+-0.01 (V)
----------
L=33.5+-0.1mm N1=1075r/min Ra=9.6mm
----------
----------
L=33.5+-0.1mm N1=1075r/min Ra=9.6mm
----------
0000002301 LEVER
(a) Speed lever
(b) Two step changeover lever
(c) Nut
(d) Shaft
(e) Load lever
(f) Pin
(g) Load lever
Instructions for adjusting the RED governor's 2 stage changeover lever.
1. Minimum-maximum speed specification adjustment
(1)Move the 2-stage changeover lever (b) until the speed lever (a) contacts the full stopper bolt.
(2)Move the load lever (e) as far as the idling position, and fix.
(3)Adjust nut (c) so that the right hand end of the shaft (d) under the 2-stage changeover lever (b) is in a position L1 from the pin (f) in the center of the load lever (e).
2. Variable speed specification adjustment
(1)Move the 2-stage changeover lever until the load lever (e) contacts the full load stopper bolt.
(2)Check that the speed lever (a) operates between the idling and the full speed position.
----------
L1=5~10mm
----------
R1=150mm R2=130mm R3=56mm a1=(16deg)+-5deg a2=(16.5deg)+-5deg a3=(25deg)+-5deg
----------
L1=5~10mm
----------
R1=150mm R2=130mm R3=56mm a1=(16deg)+-5deg a2=(16.5deg)+-5deg a3=(25deg)+-5deg
0000002401 GOVERNOR TORQUE CONTROL
Dr:Torque control stroke
(A): Without torque control spring capsule
1. Adjustment procedures
(1)Procedure is the same as that for the RFD (former type), except that the positive torque control stroke must be determined at the full lever setting.
2. Procedures for adjustment
(1)Remove the torque control spring capsule.
(2)Operate the pump at approximately N1. (End of idling spring operation < N1.)
(3)Tilt the lever to the full side.
(4)Set so that R = RF.
(5)Increase the speed by pushing in the screw (attached to the bracket on the rear of the tension lever) through the adjusting window.
(6)Adjust so that the torque control stroke Dr1 can be obtained.
(7)Align N2 and N3 with the torque control spring capsule.
3. Final confirmation
(1)After final confirmation, temporarily set the load lever to N = N1, R = idling position.
(2)From this condition, increase speed to N = N4.
(3)Confirm that positive torque control stroke is Dr2.
----------
N1=500r/min N2=(655)r/min N3=(935)r/min N4=1075r/min RF=8.9mm Dr1=0.7mm Dr2=0+0.3mm
----------
----------
N1=500r/min N2=(655)r/min N3=(935)r/min N4=1075r/min RF=8.9mm Dr1=0.7mm Dr2=0+0.3mm
----------