106873-2840 ZEXEL 9 400 618 392 BOSCH INJECTION-PUMP ASSEMBLY 9400618392 1068732840 me093024


106873-2840 INJECTION-PUMP ASSEMBLY
Rating:
20
Buy INJECTION-PUMP ASSEMBLY 106873-2840 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 618 392 9400618392
ZEXEL 106873-2840 1068732840
MITSUBISHI ME093024 me093024

Service parts 106873-2840 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-7890
3. GOVERNOR 105487-6460
4. SUPPLY PUMP 105237-1321
5. AUTOM. ADVANCE MECHANIS 105681-1000
6. COUPLING PLATE 105663-0390
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-7011
11. Nozzle and Holder ME091308
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105030-4980
14. NOZZLE 105015-8500
15. NOZZLE SET

Include in #1:

106873-2840 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 618 392 9400618392
ZEXEL 106873-2840 1068732840
MITSUBISHI ME093024 me093024


Zexel num
Bosch num
Firm num
Name
106873-2840 
9 400 618 392 
ME093024  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC9T2 * K 14CD INJECTION PUMP ASSY PE8P PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-3
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-5
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cal 1-8
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.4
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   148.1 143.7 152.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.1+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   15.8 13.4 18.2
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.4)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   148.1 147.1 149.1
Basic   *
Fixing the lever   *
Boost pressure kPa   28 28
Boost pressure mmHg   210 210
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(11.4)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   156 152 160
Fixing the lever   *
Boost pressure kPa   28 28
Boost pressure mmHg   210 210
Injection quantity adjustment_05
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   115 75 155
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   650 650 650
Rack position   R2(R1-1. 4)
Boost pressure kPa   3.3 3.3 5.3
Boost pressure mmHg   25 25 40
Boost compensator adjustment_02
Pump speed r/min   650 650 650
Rack position   R1-0.8
Boost pressure kPa   8 6.7 9.3
Boost pressure mmHg   60 50 70
Boost compensator adjustment_03
Pump speed r/min   650 650 650
Rack position   R1(11.4)
Boost pressure kPa   14.7 8 21.4
Boost pressure mmHg   110 60 160
Timer adjustment
Pump speed r/min   900--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   850
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1100
Advance angle deg.   4 3.5 4.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106873-2840
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Tolerance for racks not indicated: +-0.05mm. (4)Boost compensator cancel stroke: BSL (5)Boost compensator stroke: BCL (6)Damper spring setting (7)When air cylinder is operating.
----------
BSL=1.6mm BCL=1.4+-0.1mm
----------

Speed control lever angle

Test data 106873-2840
F:Full speed I:Idle (1)Pump speed = aa (2)Pump speed = bb (3)Pump speed cc (4)Air cylinder's adjustable range
----------
aa=1275r/min bb=275r/min cc=1190r/min
----------
a=(2deg) b=(2deg)+-5deg c=(7deg)+-5deg d=(16.5deg)+-5deg

0000000901

Test data 106873-2840
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=31.5deg+-3deg

Stop lever angle

Test data 106873-2840
S:Stop the pump. (1)Rack position = aa (2)Stopper bolt setting (3)Free (at delivery) (4)Drive side (5)Use the hole at R = bb
----------
aa=3.3-0.5mm bb=32mm
----------
a=10.5deg+-5deg b=58deg+7deg-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325r/min Ra=5.6+-0.1mm
----------

0000001601 2-STAGE CHANGEOVER DEVICE

Test data 106873-2840
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------

Timing setting

Test data 106873-2840
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(40deg)




Have questions with 106873-2840?





Group cross 106873-2840 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 388 
ME160731 
INJECTION-PUMP ASSEMBLY
8M20D
9 400 618 389 
ME092789 
INJECTION-PUMP ASSEMBLY
8DC11
9 400 618 390 
ME092805 
INJECTION-PUMP ASSEMBLY
8DC91T2
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 391 
ME160842 
INJECTION-PUMP ASSEMBLY
8M20-I
106873-2840  
9 400 618 392 
ME093024 
INJECTION-PUMP ASSEMBLY
8DC9T2
9 400 618 393 
ME093039 
INJECTION-PUMP ASSEMBLY
8DC11
9 400 618 394 
ME160953 
INJECTION-PUMP ASSEMBLY
8M20-2
9 400 618 395 
ME160954 
INJECTION-PUMP ASSEMBLY
8M20-2
9 400 618 396 
ME160955 
INJECTION-PUMP ASSEMBLY
8M20-2
9 400 618 397 
ME160956 
INJECTION-PUMP ASSEMBLY
8M20-2
Back to top