106873-2702 ZEXEL 9 400 618 378 BOSCH INJECTION-PUMP ASSEMBLY 9400618378 1068732702 me160607


106873-2702 INJECTION-PUMP ASSEMBLY
Rating:
77
Buy INJECTION-PUMP ASSEMBLY 106873-2702 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 618 378 9400618378
ZEXEL 106873-2702 1068732702
MITSUBISHI ME160607 me160607

Service parts 106873-2702 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106080-5021
3. GOVERNOR 105489-3722
4. SUPPLY PUMP 105237-5620
5. AUTOM. ADVANCE MECHANIS 105691-3570
6. COUPLING PLATE 105663-0390
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-7411
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/24.5{250}
13. NOZZLE-HOLDER 105030-4451
14. NOZZLE 105015-9400
15. NOZZLE SET

Include in #1:

106873-2702 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 618 378 9400618378
ZEXEL 106873-2702 1068732702
MITSUBISHI ME160607 me160607


Zexel num
Bosch num
Firm num
Name
106873-2702 
9 400 618 378 
ME160607  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8M20-I K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-7920
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.4 4.37 4.43
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.75 45.25
Difference between angles 2
Cal 1-7
deg.   90 89.75 90.25
Difference between angles 3
Cal 1-3
deg.   135 134.75 135.25
Difference between angles 4
Cal 1-4
deg.   180 179.75 180.25
Difference between angles 5
Cal 1-5
deg.   225 224.75 225.25
Difference between angles 6
Cal 1-6
deg.   270 269.75 270.25
Difference between angles 7
Cal 1-8
deg.   315 314.75 315.25
Injection quantity adjustment
Adjusting point   -
Rack position   10.2
Pump speed r/min   650 650 650
Each cylinder's injection qty mm3/st.   147.5 143.1 151.9
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.4+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   18 15.3 20.7
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(10.2)
Pump speed r/min   650 650 650
Average injection quantity mm3/st.   147.5 146.5 148.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.9
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   164.5 160.5 168.5
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   180 160 200
Fixing the lever   *
Remarks
After startup boost setting
 

Test data Ex:

Governor adjustment

Test data 106873-2702
N:Pump speed R:Rack position (mm) (1)Tolerance for racks not indicated: +-0.05mm. (2)Excess fuel setting for starting: SXL (3)Damper spring setting
----------
SXL=11.3+-0.1mm
----------

Timer adjustment

Test data 106873-2702
(1)Adjusting range (2)Step response time (N): Speed of the pump (L): Load (theta) Advance angle (Srd1) Step response time 1 (Srd2) Step response time 2 1. Adjusting conditions for the variable timer (1)Adjust the clearance between the pickup and the protrusion to L.
----------
L=1-0.2mm N2=800r/min C2=(8.8)deg t1=2.5--sec. t2=2.5--sec.
----------
N1=750++r/min P1=0kPa(0kgf/cm2) P2=392kPa(4kgf/cm2) C1=8.8+-0.3deg R01=0/4load R02=4/4load

Speed control lever angle

Test data 106873-2702
F:Full speed
----------

----------
a=19.5deg+-5deg

0000000901

Test data 106873-2702
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=21.5deg+-3deg

Stop lever angle

Test data 106873-2702
N:Pump normal S:Stop the pump. (1)Drive side (2)Use the hole at R = aa (3)Rack position bb (4)Stopper bolt setting
----------
aa=36mm bb=3.7-0.5mm
----------
a=10.5deg+-5deg b=57deg+7deg-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325r/min Ra=5.9+-0.1mm
----------

0000001601 RACK SENSOR

Test data 106873-2702
V1:Supply voltage V2f:Full side output voltage V2i:Idle side output voltage (A) Black (B) Yellow (C) Red (D) Trimmer (E): Shaft (F) Nut (G) Load lever 1. Load sensor adjustment (1)Connect as shown in the above diagram and apply supply voltage V1. (2)Hold the load lever (G) against the full side. (3)Turn the shaft so that the voltage between (A) and (B) is V2. (4)Hold the load lever (G) against the idle side. (5)Adjust (D) so that the voltage between (A) and (B) is V2i. (6)Repeat the above adjustments. (7)Tighten the nut (F) at the point satisfying the standards. (8)Hold the load lever against the full side stopper and the idle side stopper. (9)At this time, confirm that the full side output voltage is V2f and the idle side output voltage is V2i.
----------
V1=5+-0.02V V2f=0.15+0.03V V2i=2.35-0.03V
----------

0000001701 GOVERNOR TORQUE CONTROL

Test data 106873-2702
Dr:Torque control stroke (A): Without torque control spring capsule 1. Adjustment procedures (1)Procedure is the same as that for the RFD (former type), except that the positive torque control stroke must be determined at the full lever setting. 2. Procedures for adjustment (1)Remove the torque control spring capsule. (2)Operate the pump at approximately N1. (End of idling spring operation < N1.) (3)Tilt the lever to the full side. (4)Set so that R = RF. (5)Increase the speed by pushing in the screw (attached to the bracket on the rear of the tension lever) through the adjusting window. (6)Adjust so that the torque control stroke Dr1 can be obtained. (7)Align N2 and N3 with the torque control spring capsule. 3. Final confirmation (1)After final confirmation, temporarily set the load lever to N = N1, R = idling position. (2)From this condition, increase speed to N = N4. (3)Confirm that positive torque control stroke is Dr2.
----------
N1=500r/min N2=(700)r/min N3=(940)r/min N4=1100r/min RF=R1(10.2)mm Dr1=0.9mm Dr2=0+0.3mm
----------

Timing setting

Test data 106873-2702
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=10deg
----------
a=(40deg)




Have questions with 106873-2702?





Group cross 106873-2702 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

106873-2702  
9 400 618 378 
ME160607 
INJECTION-PUMP ASSEMBLY
8M20-I
9 400 619 463 
 
INJECTION-PUMP ASSEMBLY
9 400 619 464 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 379 
ME160608 
INJECTION-PUMP ASSEMBLY
8M20-I
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 380 
ME160609 
INJECTION-PUMP ASSEMBLY
8M20D
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 381 
ME160610 
INJECTION-PUMP ASSEMBLY
8M20D
9 400 618 382 
ME092488 
INJECTION-PUMP ASSEMBLY
8DC9
9 400 618 383 
ME092503 
INJECTION-PUMP ASSEMBLY
8DC92
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 384 
ME160679 
INJECTION-PUMP ASSEMBLY
8M20-I
9 400 618 385 
ME092643 
INJECTION-PUMP ASSEMBLY
8DC92
9 400 618 386 
ME092630 
INJECTION-PUMP ASSEMBLY
8DC91
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 387 
ME160730 
INJECTION-PUMP ASSEMBLY
8M20-I
Back to top