106871-7210 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1068717210


106871-7210 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 106871-7210 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 106871-7210 1068717210

Cross reference number

ZEXEL 106871-7210 1068717210


Zexel num
Bosch num
Firm num
Name
106871-7210 
106871-7211 
 
  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC91T2 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-3
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-5
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cal 1-8
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.4
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   156 151 161
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.1+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   20 17 23
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.4)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   156 155 157
Basic   *
Fixing the lever   *
Boost pressure kPa   33.3 33.3
Boost pressure mmHg   250 250
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(11.4)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   164 157 171
Difference in delivery mm3/st.   14 14 14
Fixing the lever   *
Boost pressure kPa   33.3 33.3
Boost pressure mmHg   250 250
Injection quantity adjustment_05
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   130 90 170
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   650 650 650
Rack position   9.9
Boost pressure kPa   8 8 8
Boost pressure mmHg   60 60 60
Boost compensator adjustment_02
Pump speed r/min   650 650 650
Rack position   10.8
Boost pressure kPa   12 10.7 13.3
Boost pressure mmHg   90 80 100
Boost compensator adjustment_03
Pump speed r/min   650 650 650
Rack position   R1(11.4)
Boost pressure kPa   20 13.3 26.7
Boost pressure mmHg   150 100 200
Timer adjustment
Pump speed r/min   (900+-50 )
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1100
Advance angle deg.   4 3.5 4.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106871-7210
N:Pump speed R:Rack position (mm) (1)Boost compensator cancel stroke: BSL (2)Boost compensator stroke (3)Damper spring setting: DL
----------
BSL=1.6mm DL=4.3-0.2mm
----------

Speed control lever angle

Test data 106871-7210
(1)Set the pump speed at aa (2)Set the pump speed at bb. (3)Set the pump speed to cc. (4)Set using the stopper bolt for the bottom air cylinder.
----------
aa=1150r/min bb=620r/min cc=850r/min
----------
a=18deg+-5deg b=11deg+-5deg c=7deg+-5deg

0000000901

Test data 106871-7210
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=31.5deg+-3deg

Stop lever angle

Test data 106871-7210
N:Engine manufacturer's normal use S:Stop the pump. (1)Rack position = aa (2)Stopper bolt setting (3)Rack position bb (4)Free (at shipping)
----------
aa=4-0.5mm bb=14.6mm
----------
a=43deg+7deg-5deg b=30deg+-5deg c=(10.5deg)

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325+-5r/min Ra=5.6mm
----------

0000001601 2-STAGE CHANGEOVER DEVICE

Test data 106871-7210
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------

0000001701 AIR CYLINDER

Test data 106871-7210
PS:Pump set speed SL:Cylinder position U:Top B:Bottom X:Release Y:Operation 1. Air cylinder operation confirmation (1)Apply air pressure P1 to the upper and lower cylinders. (2)Confirm that the speed can be set.
----------
P1=392+98kPa(4+1kgf/cm2)
----------
N1=620r/min N2=1150r/min N3=850r/min N4=1150r/min

Timing setting

Test data 106871-7210
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(40deg)




Have questions with 106871-7210?





Group cross 106871-7210 ZEXEL

Mitsubishi 

 
 
INJECTION-PUMP ASSEMBLY
8DC91T2
9 400 618 195 
ME065881 
INJECTION-PUMP ASSEMBLY
8DC91T2
106871-7210  

106871-7211 
 
 
INJECTION-PUMP ASSEMBLY
8DC91T2
9 400 618 196 
ME065882 
INJECTION-PUMP ASSEMBLY
8DC91T2
 
 
INJECTION-PUMP ASSEMBLY
8DC91T2
9 400 618 197 
ME065883 
INJECTION-PUMP ASSEMBLY
8DC91T2
 
 
INJECTION-PUMP ASSEMBLY
8DC9TL
9 400 618 198 
ME098524 
INJECTION-PUMP ASSEMBLY
8DC9TL
9 400 618 199 
ME065930 
INJECTION-PUMP ASSEMBLY
8DC9
9 400 618 200 
ME065932 
INJECTION-PUMP ASSEMBLY
8DC9
9 400 618 201 
ME065908 
INJECTION-PUMP ASSEMBLY
8DC82
9 400 618 202 
ME065913 
INJECTION-PUMP ASSEMBLY
8DC91
9 400 618 203 
ME065866 
INJECTION-PUMP ASSEMBLY
8DC9
9 400 618 204 
ME065914 
INJECTION-PUMP ASSEMBLY
8DC91
Back to top