106871-2640 ZEXEL 9 400 613 133 BOSCH INJECTION-PUMP ASSEMBLY 9400613133 1068712640 me066681


106871-2640 INJECTION-PUMP ASSEMBLY
Rating:
12
Buy INJECTION-PUMP ASSEMBLY 106871-2640 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 613 133 9400613133
ZEXEL 106871-2640 1068712640
MITSUBISHI ME066681 me066681

Service parts 106871-2640 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-5600
3. GOVERNOR 105487-1790
4. SUPPLY PUMP 105207-1140
5. AUTOM. ADVANCE MECHANIS 105636-0770
6. COUPLING PLATE 105663-0260
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-5570
11. Nozzle and Holder ME6H6045A
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105031-4500
14. NOZZLE 105015-5070
15. NOZZLE SET

Include in #1:

106871-2640 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 613 133 9400613133
ZEXEL 106871-2640 1068712640
MITSUBISHI ME066681 me066681


Zexel num
Bosch num
Firm num
Name
106871-2640 
106871-7310 
9 400 613 133 
ME066681  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC8 K 14CD INJECTION PUMP ASSY PE8P PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-3
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-5
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cal 1-8
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   -
Rack position   8.8
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   97 94.1 99.9
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.1+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   20 17 23
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(8.8)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   97 96 98
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(8.8)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   105.7 101.5 109.9
Difference in delivery mm3/st.   8.4 8.4 8.4
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   135 115 155
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   950--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   900
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1000
Advance angle deg.   1.8 1.1 2.5
Timer adjustment_04
Pump speed r/min   1100
Advance angle deg.   3.5 3.5
Timer adjustment_05
Pump speed r/min   1150
Advance angle deg.   6.5 6 7
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106871-2640
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Lever ratio: RT (4)Target shim dimension: TH (5)Tolerance for racks not indicated: +-0.05mm. (6)Excess fuel setting for starting: SXL (7)Damper spring setting (8)When air cylinder is operating.
----------
RT=1 TH=2.3mm SXL=11.3+-0.1mm
----------

Speed control lever angle

Test data 106871-2640
F:Full speed I:Idle (1)- (2)Air cylinder's adjustable range (3)Pump speed = aa (4)Pump speed = bb (5)Pump speed cc
----------
aa=1200r/min bb=275r/min cc=800r/min
----------
a=13deg b=13deg+-5deg c=23deg+-5deg d=8deg+-5deg

0000000901

Test data 106871-2640
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=23.5deg+-3deg

Stop lever angle

Test data 106871-2640
N:Engine manufacturer's normal use S:Stop the pump. (1)Rack position = aa (2)Stopper bolt setting (3)Rack position bb (4)Free (at shipping)
----------
aa=4-0.5mm bb=11.7mm
----------
a=43deg+7deg-5deg b=21.5deg+-5deg c=(10.5deg)

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325r/min Ra=5.6+-0.1mm
----------

0000001601 2-STAGE CHANGEOVER DEVICE

Test data 106871-2640
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------




Have questions with 106871-2640?





Group cross 106871-2640 ZEXEL

Mitsubishi 

9 400 618 093 
ME066613 
INJECTION-PUMP ASSEMBLY
8DC9
9 400 618 094 
ME066614 
INJECTION-PUMP ASSEMBLY
8DC9
 
ME066654 
INJECTION-PUMP ASSEMBLY
8DC82
 
ME066653 
INJECTION-PUMP ASSEMBLY
8DC91
106871-2640  

106871-7310 
9 400 613 133 
ME066681 
INJECTION-PUMP ASSEMBLY
8DC8
9 400 618 095 
ME066682 
INJECTION-PUMP ASSEMBLY
8DC9
9 400 618 096 
ME066700 
INJECTION-PUMP ASSEMBLY
8DC82
9 400 611 159 
ME066701 
INJECTION-PUMP ASSEMBLY
8DC82
9 400 618 097 
ME066702 
INJECTION-PUMP ASSEMBLY
8DC82
Back to top