106861-2310 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1068612310


106861-2310 INJECTION-PUMP ASSEMBLY
Rating:
57
Buy INJECTION-PUMP ASSEMBLY 106861-2310 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 106861-2310 1068612310

Cross reference number

ZEXEL 106861-2310 1068612310


Zexel num
Bosch num
Firm num
Name
106861-2310 
106861-2311 
 
  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC9T0 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-3
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-5
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cal 1-8
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.3
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   137 132.9 141.1
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   7+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   18.5 16 21
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.3)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   137 136 138
Basic   *
Fixing the lever   *
Boost pressure kPa   33.3 33.3
Boost pressure mmHg   250 250
Injection quantity adjustment_04
Adjusting point   B
Rack position   R2(11.2)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   132 130 134
Fixing the lever   *
Boost pressure kPa   33.3 33.3
Boost pressure mmHg   250 250
Injection quantity adjustment_05
Adjusting point   D
Rack position   11.3
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   130 126.3 133.7
Fixing the lever   *
Boost pressure kPa   12.7 12.7 12.7
Boost pressure mmHg   95 95 95
Injection quantity adjustment_06
Adjusting point   E
Rack position   -
Pump speed r/min   200 200 200
Average injection quantity mm3/st.   120 100 140
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   400 400 400
Rack position   9.9
Boost pressure kPa   2 2 2
Boost pressure mmHg   15 15 15
Boost compensator adjustment_02
Pump speed r/min   400 400 400
Rack position   11.3
Boost pressure kPa   12.7 11.4 14
Boost pressure mmHg   95 85 105
Boost compensator adjustment_03
Pump speed r/min   400 400 400
Rack position   (12.5)
Boost pressure kPa   20 20 20
Boost pressure mmHg   150 150 150
Timer adjustment
Pump speed r/min   980--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   (900)
Advance angle deg.   0 0 0
Timer adjustment_03
Pump speed r/min   1050
Advance angle deg.   3 2.5 3.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106861-2310
N:Pump speed R:Rack position (mm) (1)Boost compensator cancel stroke: BSL (2)Boost compensator stroke (3)Damper spring setting: DL
----------
BSL=1.6mm DL=5.8-0.2mm
----------

Speed control lever angle

Test data 106861-2310
F:Full speed (1)Set the pump speed at aa (2)Set the pump speed at bb.
----------
aa=1150r/min bb=(390)r/min
----------
a=18deg+-5deg b=(15deg)+-5deg

0000000901

Test data 106861-2310
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=32.5deg+-3deg

Stop lever angle

Test data 106861-2310
N:Pump normal S:Stop the pump. (1)Rack position = aa (2)Stopper bolt setting (3)Rack position bb (4)Free (at shipping)
----------
aa=4.7-0.5mm bb=15.3mm
----------
a=43deg+7deg-5deg b=30deg+-5deg c=(10.5deg)

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325+-5r/min Ra=6.7mm
----------

0000001601 2-STAGE CHANGEOVER DEVICE

Test data 106861-2310
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------

Timing setting

Test data 106861-2310
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(40deg)




Have questions with 106861-2310?





Group cross 106861-2310 ZEXEL

Mitsubishi 

 
 
INJECTION-PUMP ASSEMBLY
8DC9T0
9 400 617 979 
ME065613 
INJECTION-PUMP ASSEMBLY
8DC9T0
106861-2310  

106861-2311 
 
 
INJECTION-PUMP ASSEMBLY
8DC9T0
 
ME065614 
INJECTION-PUMP ASSEMBLY
8DC9T0
 
 
INJECTION-PUMP ASSEMBLY
8DC91T0
9 400 617 980 
ME065878 
INJECTION-PUMP ASSEMBLY
8DC91T0
 
 
INJECTION-PUMP ASSEMBLY
8DC91T0
9 400 617 981 
ME065879 
INJECTION-PUMP ASSEMBLY
8DC91T0
 
 
INJECTION-PUMP ASSEMBLY
8DC9T0
9 400 617 982 
ME065880 
INJECTION-PUMP ASSEMBLY
8DC9T0
 
 
INJECTION-PUMP ASSEMBLY
8DC9T0
 
 
INJECTION-PUMP ASSEMBLY
8DC9T0
 
ME065615 
INJECTION-PUMP ASSEMBLY
8DC9T0
 
 
INJECTION-PUMP ASSEMBLY
8DC9T
9 400 617 983 
ME098529 
INJECTION-PUMP ASSEMBLY
8DC9T
 
 
INJECTION-PUMP ASSEMBLY
8DC9T
9 400 617 984 
ME098530 
INJECTION-PUMP ASSEMBLY
8DC9T
 
 
INJECTION-PUMP ASSEMBLY
8DC9T0
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

 
ME065935 
INJECTION-PUMP ASSEMBLY
8DC9T0
Back to top