106676-2800 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066762800


106676-2800 INJECTION-PUMP ASSEMBLY
Rating:
44
Buy INJECTION-PUMP ASSEMBLY 106676-2800 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 106676-2800 1066762800

Cross reference number

ZEXEL 106676-2800 1066762800


Zexel num
Bosch num
Firm num
Name
106676-2800 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4420
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.9 3.85 3.95
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   14
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   164 161 167
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Boost pressure kPa   30 30
Boost pressure mmHg   225 225
Injection quantity adjustment_02
Adjusting point   -
Rack position   9.9+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   16 13.4 18.6
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Boost compensator adjustment
Pump speed r/min   900 900 900
Rack position   R1-1.2
Boost pressure kPa   5.3 4 6.6
Boost pressure mmHg   40 30 50
Boost compensator adjustment_02
Pump speed r/min   900 900 900
Rack position   R1(14)
Boost pressure kPa   16.7 10 23.4
Boost pressure mmHg   125 75 175

Test data Ex:

Governor adjustment

Test data 106676-2800
N:Pump speed R:Rack position (mm) (1)Notch fixed: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator stroke (4)Rack difference between N = N1 and N = N2 (5)Set idle sub-spring
----------
K=10 N1=1000r/min N2=400r/min
----------

Timer adjustment

Test data 106676-2800
(1)Adjusting range (2)Step response time (N): Speed of the pump (L): Load (theta) Advance angle (Srd1) Step response time 1 (Srd2) Step response time 2 1. Adjusting conditions for the variable timer (1)Adjust the clearance between the pickup and the protrusion to L.
----------
L=1.5-0.2mm N2=800r/min C2=(10deg) t1=2.5--sec. t2=2.5--sec.
----------
N1=750++r/min P1=0kPa(0kgf/cm2) P2=392kPa(4kgf/cm2) C1=10+-0.3deg R01=0/4 load R02=4/4 load

Speed control lever angle

Test data 106676-2800
F:Full speed I:Idle (1)Stopper bolt setting (2)Base lever only
----------

----------
a=(1.5deg)+-5deg b=(17deg)+-5deg

Stop lever angle

Test data 106676-2800
N:Pump normal S:Stop the pump. (1)Normal (2)Use the hole at R = aa (3)Rack position bb, pump speed cc (seal at delivery)
----------
aa=17mm bb=1-0.5mm cc=0r/min
----------
a=35deg+-5deg b=70deg+-5deg

0000001501 RACK SENSOR

Test data 106676-2800
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1000r/min Ra=14mm
----------

0000001601 TAMPER PROOF

Test data 106676-2800
Tamperproofing-equipped boost compensator cover installation procedure (A) After adjusting the boost compensator, tighten the bolts to remove the heads. (1)Before adjusting the governor and the boost compensator, tighten the screw to the specified torque. (Tightening torque T = T1 maximum) (2)After adjusting the governor and the boost compensator, tighten to the specified torque to break off the bolt heads. (Tightening torque T = T2 maximum)
----------
T1=2.5N-m(0.25kgf-m) T2=2.9~4.4N-m(0.3~0.45kgf-m)
----------

Timing setting

Test data 106676-2800
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=5deg
----------
a=(2deg)




Have questions with 106676-2800?





Group cross 106676-2800 ZEXEL

106676-2800  
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 613 389 
ME441650 
INJECTION-PUMP ASSEMBLY
6D24TL
9 400 617 465 
ME441574 
INJECTION-PUMP ASSEMBLY
6D24TL
9 400 617 466 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

F 019 Z20 151 
ME441949 
INJECTION-PUMP ASSEMBLY
6D24TL
9 400 617 467 
ME441825 
INJECTION-PUMP ASSEMBLY
6D24TL
9 400 619 434 
ME442417 
INJECTION-PUMP ASSEMBLY
6D24TL
 
ME444935 
INJECTION-PUMP ASSEMBLY
6D24TL
 
ME360172 
INJECTION-PUMP ASSEMBLY
6D24T1
Back to top