104748-2050 ZEXEL 9 460 610 148 BOSCH INJECTION-PUMP ASSEMBLY 9460610148 1047482050


104748-2050 INJECTION-PUMP ASSEMBLY
Rating:
47
Buy INJECTION-PUMP ASSEMBLY 104748-2050 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 460 610 148 9460610148
ZEXEL 104748-2050 1047482050

Cross reference number

BOSCH 9 460 610 148 9460610148
ZEXEL 104748-2050 1047482050


Zexel num
Bosch num
Firm num
Name
104748-2050 
104748-2051 
9 460 610 148 
   
INJECTION-PUMP ASSEMBLY
* K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113orSAEJ967d
Test oil temperature degC   45 45 50
Nozzle   105000-2010
Bosch type code   NP-DN12SD12TT
Nozzle holder   105780-2080
Opening pressure MPa   14.7 14.7 15.19
Opening pressure kgf/cm2   150 150 155
Injection pipe
Inside diameter - outside diameter - length (mm)
mm   2-6-840
Transfer pump pressure kPa   20 20 20
Transfer pump pressure kgf/cm2   0.2 0.2 0.2
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   29.1 28.6 29.6
Difference in delivery mm3/st.   2.5
Basic   *
Injection timing adjustment_02
Pump speed r/min   2700 2700 2700
Average injection quantity mm3/st.   14.9 11.4 18.4
Injection timing adjustment_03
Pump speed r/min   2500 2500 2500
Average injection quantity mm3/st.   27.7 25.7 29.7
Injection timing adjustment_04
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   29.1 28.1 30.1
Injection timing adjustment_05
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   26.3 24.3 28.3
Injection quantity adjustment
Pump speed r/min   2700 2700 2700
Average injection quantity mm3/st.   14.9 11.9 17.9
Basic   *
Injection quantity adjustment_02
Pump speed r/min   2900 2900 2900
Average injection quantity mm3/st.   6
Governor adjustment
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   9.8 8.3 11.3
Difference in delivery mm3/st.   3
Basic   *
Governor adjustment_02
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   9.8 7.8 11.8
Governor adjustment_03
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   3
Boost compensator adjustment
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   16.65 13.3 20
Remarks
From idle
 
Timer adjustment
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   50.3 45.3 55.3
Basic   *
Speed control lever angle
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   0 0 0
Remarks
Magnet OFF
 
0000000901
Pump speed r/min   1200 1200 1200
Overflow quantity cm3/min   348 216 480
Stop lever angle
Pump speed r/min   1200 1200 1200
Pressure kPa   333.5 304 363
Pressure kgf/cm2   3.4 3.1 3.7
Basic   *
Stop lever angle_02
Pump speed r/min   1200 1200 1200
Pressure kPa   333.5 294 373
Pressure kgf/cm2   3.4 3 3.8
Stop lever angle_03
Pump speed r/min   1800 1800 1800
Pressure kPa   470.5 431 510
Pressure kgf/cm2   4.8 4.4 5.2
Stop lever angle_04
Pump speed r/min   2500 2500 2500
Pressure kPa   637.5 598 677
Pressure kgf/cm2   6.5 6.1 6.9
0000001101
Pump speed r/min   1200 1200 1200
Timer stroke mm   2.6 2.3 2.9
Basic   *
_02
Pump speed r/min   1200 1200 1200
Timer stroke mm   2.6 2.2 3
_03
Pump speed r/min   1800 1800 1800
Timer stroke mm   4.9 4.3 5.5
_04
Pump speed r/min   2500 2500 2500
Timer stroke mm   8 7.4 8.6
0000001201
Max. applied voltage V   8 8 8
Test voltage V   13 12 14
0000001501
Pump speed r/min   1200 1200 1200
Atmospheric pressure difference kPa   -18.7 -19.4 -18
Atmospheric pressure difference mmHg   -140 -145 -135
Decrease qty mm3/st.   2.6 1.1 4.1
Remarks
MEASURE
 
Timing setting
K dimension mm   3.3 3.2 3.4
KF dimension mm   5.8 5.7 5.9
MS dimension mm   1.8 1.7 1.9
Control lever angle alpha deg.   24 20 28
Control lever angle beta deg.   42 37 47
Control lever angle gamma deg.   11 10.5 11.5

Test data Ex:

0000001501 ANEROID COMPENSATOR

Test data 104748-2050
ACS adjustment Full load injection quantity at high altitudes and ACS adjusting method 1. Full load injection quantity adjustment (1)Remove the ACS cover and remove the bellows and adjusting shim. (2)Perform all adjustments as per the adjustment standard except for ACS adjustment. 2. ACS adjustment (1)Assemble the ACS cover, bellows and adjusting shim. (2)At pump speed N1, adjust using a shim to obtain the decrease for the altitude shown in the table. X1 = atmospheric pressure X2 = altitude Y = decrease quantity (A) = adjustment value (B) = test value
----------
N1=1200r/min
----------

0000001801 STARTING I/Q ADJUSTMENT

Starting injection quantity adjustment Adjust adjusting bolt so that the starting injection quantity is within the standard. Fix using nut. (A): Lock nut. (B): Stopping lever (C): Adjustment bolt
----------

----------

0000001901 POTENTIOMETER ADJUSTMENT

Test data 104748-2050
Adjustment of the potentiometer At pump speed N = N1 and with the control lever angle at a from the idle position (corresponding to a shim thickness of L), convert the injection quantity obtained to a voltage value using the graph and adjust the potentiometer. Caution: Confirm that the voltage increases when the control lever is turned to the full speed side. E:J = formula Vi:Applied voltage Vo = output voltage Q = injection quantity
----------
N1=700r/min a=11deg L=7mm
----------
J=V+-0.05=0.187Q+1.593 V Vi=-V

0000002001 W-CSD ADJUSTMENT

Test data 104748-2050
Adjustment of the W-CSD 1. Timer advance adjustment (refer to Fig 1 [O], 3 [Q]). (1)Determine the timer advance angle from the graph in Fig. 3 (Q). (2)(1) Adjust with the screw (A) so that the timer advance angle determined in the item (1) is obtained. 2. Setting the intermediate lever position (refer to fig 1 and fig 2) (1)Insert a block gauge L1 between the idling set screw (G) and the control lever (F). (2)Align the intermediate lever (D) with the aligning line and position it perpendicularly. Adjust the screw (E) so that it contacts the control lever (F), then turn the screw 0.5 ~ 1 turns counterclockwise and fix. [At this time, tilt the intermediate lever clockwise b from a perpendicular position to obtain L3 shown in Figure 1 (O).] 3. W-CSD lever adjustment [refer to fig 1 (O) and fig 2 (P)] (1)Insert a block gauge L2 determined from the graph (L-t) in figure 3 (Q) between the idling set screw (G) and the control lever (F). (2)Fix screw (B) so that the W-CSD lever (C)'s roller contacts the intermediate lever (D). Adjust the screw (B) until the screw (F) contacts the control lever (G). Then fix locknut (A). Note: Apply red paint after adjustment. When inserting the block gauge, separate lever (C) and (D) using screw (B) to prevent excessive force on the lever. X = temperature t (V) Y1 = timer lift TA (mm) Y2 = control lever dimension L mm (control lever position J = graph TA - t -10 <= t (deg C) <= 20: TA = -0.028t + 1.367 20 <= t (deg C) <= 60: TA = -0.02 t + 1.2 K:Graph L-t -10 <= t (deg C) <= 20: L = -0.0667t + 3.23 20 <= t (deg C) <= 60: L = -0.05 t + 2.9
----------
L1=10+-0.05mm L2=L+-0.05mm L3=(44)mm a=30degC b=1~3degC
----------
L3=(44)mm




Have questions with 104748-2050?





Group cross 104748-2050 ZEXEL

Nissan 

9 460 613 682 
1670016A00 
INJECTION-PUMP ASSEMBLY
XM1
9 460 610 012 
1670016A10 
INJECTION-PUMP ASSEMBLY
XM1
 
 
INJECTION-PUMP ASSEMBLY

Nissan 

 
1670017A00 
INJECTION-PUMP ASSEMBLY
XM1
9 460 613 683 
1670016A05 
INJECTION-PUMP ASSEMBLY
XM1
9 460 610 482 
1670016A15 
INJECTION-PUMP ASSEMBLY
XM1
104748-2050  

104748-2051 
9 460 610 148 
 
INJECTION-PUMP ASSEMBLY

Nissan 

 
1670017A05 
INJECTION-PUMP ASSEMBLY
XM1
9 460 610 056 
1670016A65 
INJECTION-PUMP ASSEMBLY
XM1
9 460 610 013 
1670016A60 
INJECTION-PUMP ASSEMBLY
XM1
9 460 610 057 
1670016A75 
INJECTION-PUMP ASSEMBLY
XM1
9 460 610 014 
1670016A70 
INJECTION-PUMP ASSEMBLY
XM1
Back to top