104748-1630 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1047481630 8941698041


104748-1630 INJECTION-PUMP ASSEMBLY
Rating:
15
Buy INJECTION-PUMP ASSEMBLY 104748-1630 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 104748-1630 1047481630
ISUZU 8941698041 8941698041

Cross reference number

ZEXEL 104748-1630 1047481630
ISUZU 8941698041 8941698041


Zexel num
Bosch num
Firm num
Name
104748-1630 
 
8941698041  ISUZU
INJECTION-PUMP ASSEMBLY
4EC1 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113orSAEJ967d
Test oil temperature degC   45 45 50
Nozzle   105000-2010
Bosch type code   NP-DN12SD12TT
Nozzle holder   105780-2080
Opening pressure MPa   14.7 14.7 15.19
Opening pressure kgf/cm2   150 150 155
Injection pipe
Inside diameter - outside diameter - length (mm)
mm   2-6-840
Transfer pump pressure kPa   20 20 20
Transfer pump pressure kgf/cm2   0.2 0.2 0.2
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   30 29.5 30.5
Difference in delivery mm3/st.   2.5
Basic   *
Oil temperature degC   50 48 52
Injection timing adjustment_02
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   28.8 27.3 30.3
Oil temperature degC   50 48 52
Injection timing adjustment_03
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   30 29 31
Difference in delivery mm3/st.   2.5
Basic   *
Oil temperature degC   50 48 52
Injection timing adjustment_04
Pump speed r/min   2500 2500 2500
Average injection quantity mm3/st.   26.6 25 28.2
Difference in delivery mm3/st.   3.5
Oil temperature degC   55 52 58
Injection timing adjustment_05
Pump speed r/min   2600 2600 2600
Average injection quantity mm3/st.   27 24 30
Oil temperature degC   55 52 58
Injection timing adjustment_06
Pump speed r/min   2700 2700 2700
Average injection quantity mm3/st.   23 20 26
Oil temperature degC   55 52 58
Injection quantity adjustment
Pump speed r/min   2965 2965 2965
Average injection quantity mm3/st.   11 8 14
Difference in delivery mm3/st.   3.5
Basic   *
Oil temperature degC   55 52 58
Injection quantity adjustment_02
Pump speed r/min   2965 2965 2965
Average injection quantity mm3/st.   11 8 14
Difference in delivery mm3/st.   3.5
Oil temperature degC   55 52 58
Governor adjustment
Pump speed r/min   415 415 415
Average injection quantity mm3/st.   6 5 7
Difference in delivery mm3/st.   2
Basic   *
Oil temperature degC   48 46 50
Governor adjustment_02
Pump speed r/min   415 415 415
Average injection quantity mm3/st.   6 5 7
Difference in delivery mm3/st.   2
Oil temperature degC   48 46 50
Timer adjustment
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   50 50
Basic   *
Oil temperature degC   48 46 50
Remarks
Full
 
Timer adjustment_02
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   50 50
Oil temperature degC   48 46 50
Speed control lever angle
Pump speed r/min   415 415 415
Average injection quantity mm3/st.   0 0 0
Oil temperature degC   48 46 50
Remarks
Magnet OFF at idling position
 
0000000901
Pump speed r/min   1250 1250 1250
Overflow quantity cm3/min   370 240 500
Oil temperature degC   50 48 52
Stop lever angle
Pump speed r/min   1250 1250 1250
Pressure kPa   363 343 383
Pressure kgf/cm2   3.7 3.5 3.9
Basic   *
Oil temperature degC   50 48 52
Stop lever angle_02
Pump speed r/min   1250 1250 1250
Pressure kPa   363 343 383
Pressure kgf/cm2   3.7 3.5 3.9
Basic   *
Oil temperature degC   50 48 52
Stop lever angle_03
Pump speed r/min   2700 2700 2700
Pressure kPa   765 726 804
Pressure kgf/cm2   7.8 7.4 8.2
Oil temperature degC   55 52 58
0000001101
Pump speed r/min   1250 1250 1250
Timer stroke mm   2.5 2.3 2.7
Basic   *
Oil temperature degC   50 48 52
_02
Pump speed r/min   650 550 750
Timer stroke mm   0.5 0.5 0.5
Oil temperature degC   50 48 52
_03
Pump speed r/min   1250 1250 1250
Timer stroke mm   2.5 2.3 2.7
Basic   *
Oil temperature degC   50 48 52
_04
Pump speed r/min   2000 2000 2000
Timer stroke mm   5 4.6 5.4
Oil temperature degC   50 48 52
_05
Pump speed r/min   2700 2700 2700
Timer stroke mm   7.4 7.1 7.8
Oil temperature degC   55 52 58
0000001201
Max. applied voltage V   8 8 8
Test voltage V   13 12 14
0000001401
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   18 17 19
Timer stroke TA mm   1.7 1.7 1.7
Timer stroke variation dT mm   0.8 0.6 1
Basic   *
Oil temperature degC   50 48 52
_02
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   18 17 19
Timer stroke variation dT mm   0.8 0.4 1.2
Basic   *
Oil temperature degC   50 48 52
_03
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   10 9 11
Timer stroke variation dT mm   1.6 1.2 2
Oil temperature degC   50 48 52
Timing setting
K dimension mm   3.3 3.2 3.4
KF dimension mm   5.8 5.7 5.9
MS dimension mm   1.6 1.5 1.7
Control lever angle alpha deg.   20 16 24
Control lever angle beta deg.   40 37 43

Test data Ex:

0000001801 VACUUM REGULATOR

Test data 104748-1630
Vacuum regulator adjustment (A) Vacuum source (B) Outlet (C) control lever position (D) The gap between the control lever and the idle set screw. (E) VRV output negative pressure (G) Standard (F) Full (I) Idle 1. Set the VRV input negative pressure P1 at pump speed N1. 2. Perform adjustment and measurement with the lever moved from Idle to the Full side.
----------
N1=0r/min P1=-80.0kPa(-600mmHg)
----------
a=26deg b=8.4mm c=66.7+2.7-4.0kPa(500+20-30mmHg) d=23.5+-0.7kPa(176+-5mmHg) e=20.0+-2.0kPa(150+-15mmHg)

0000001901 W-CSD ADJUSTMENT

Test data 104748-1630
Adjustment of the W-CSD 1. Adjustment of the timer stroke Adjust screw (A) so that the timer stroke is the value determined from the graph. Timer stroke (mm), (1) TA=-0.0235t+1.17 Lever position (deg) (2) theta = -0.0625t+4.85 (-20 <= t <= 20) Theta 2 = -0.12t + 6 (20 deg C <= t <= 50 deg C) Lever position (mm) (3) L1 = -0.02075t+1.585 (-20 <= t <= 20) L2=-0.039t+1.95 (20<=t<=50) (3 shows the gap between the control lever and the idle set screw.) 2. Adjustment of the position of the intermediate lever. Insert a shim L1 between the control lever (I) and the idle set screw (G). Align the intermediate lever (F) with the aligning line (J) and fix screw (E) so that it contacts the control lever. 3. Adjustment of the FICD Insert a shim L2 between the control lever (I) and the idle set screw (G). Use adjusting screw (B) to fix the CSD lever (C) in the position where it operates the intermediate lever via the rod (D). X:Temperature t (deg C) Y1:Timer stroke (mm) Y2:Control lever position (deg) (S) Cold advancer: cooling water temperature: increase direction M:Standard point N:Pump speed (R) Cooling water temperature (O) Timer piston stroke (P) Lever position (deg) (Q) lever position (mm)
----------
L1=0.86+-0.05mm L2=L1+-0.05mm
----------
L1=0.86+-0.05mm N1=500r/min a=20degC b=-20degC O1=0.7+-0.4mm O2=1.6+-0.6mm c=3.6+-1deg d=6.1+-3deg Q1=1.2+-0.3mm Q2=2+-1mm




Have questions with 104748-1630?





Group cross 104748-1630 ZEXEL

Isuzu 

9 460 615 063 
8941494631 
INJECTION-PUMP ASSEMBLY
4EC1
9 460 615 064 
8941494621 
INJECTION-PUMP ASSEMBLY
4EC1
 
8941698031 
INJECTION-PUMP ASSEMBLY
4EC1
104748-1630  
 
8941698041 
INJECTION-PUMP ASSEMBLY
4EC1
 
8941698032 
INJECTION-PUMP ASSEMBLY
4EC1
 
8941698033 
INJECTION-PUMP ASSEMBLY
4EC1
 
 
INJECTION-PUMP ASSEMBLY
4EC1
9 460 614 638 
8941698034 
INJECTION-PUMP ASSEMBLY
4EC1
 
8944134490 
INJECTION-PUMP ASSEMBLY
4EC1
 
8944134491 
INJECTION-PUMP ASSEMBLY
4EC1
 
 
INJECTION-PUMP ASSEMBLY
4EC1
9 460 614 639 
8944134492 
INJECTION-PUMP ASSEMBLY
4EC1
 
8944088700 
INJECTION-PUMP ASSEMBLY
4EC1
 
 
INJECTION-PUMP ASSEMBLY
4EC1
9 460 610 475 
8944088701 
INJECTION-PUMP ASSEMBLY
4EC1
9 460 610 477 
 
INJECTION-PUMP ASSEMBLY
4FB1
9 460 612 344 
8941524130 
INJECTION-PUMP ASSEMBLY
4EC1
 
 
INJECTION-PUMP ASSEMBLY
4EC1
9 460 613 680 
8944429070 
INJECTION-PUMP ASSEMBLY
4EC1
Back to top