104748-0261 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1047480261


104748-0261 INJECTION-PUMP ASSEMBLY
Rating:
86
Buy INJECTION-PUMP ASSEMBLY 104748-0261 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 104748-0261 1047480261

Cross reference number

ZEXEL 104748-0261 1047480261


Zexel num
Bosch num
Firm num
Name
104748-0261 
104748-0265 
 
  MAZDA
INJECTION-PUMP ASSEMBLY
R2 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113orSAEJ967d
Test oil temperature degC   45 45 50
Nozzle   105000-2010
Bosch type code   NP-DN12SD12TT
Nozzle holder   105780-2080
Opening pressure MPa   14.7 14.7 15.19
Opening pressure kgf/cm2   150 150 155
Injection pipe
Inside diameter - outside diameter - length (mm)
mm   2-6-840
Transfer pump pressure kPa   20 20 20
Transfer pump pressure kgf/cm2   0.2 0.2 0.2
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   37.5 37 38
Difference in delivery mm3/st.   2.5
Basic   *
Injection timing adjustment_02
Pump speed r/min   2400 2400 2400
Average injection quantity mm3/st.   13.1 10.1 16.1
Injection timing adjustment_03
Pump speed r/min   2125 2125 2125
Average injection quantity mm3/st.   32.8 30.8 34.8
Injection timing adjustment_04
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   37.5 36.5 38.5
Injection timing adjustment_05
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   31.5 29.5 33.5
Injection quantity adjustment
Pump speed r/min   2400 2400 2400
Average injection quantity mm3/st.   13.1 11.1 15.1
Basic   *
Injection quantity adjustment_02
Pump speed r/min   2550 2550 2550
Average injection quantity mm3/st.   4
Governor adjustment
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   8 6 10
Difference in delivery mm3/st.   2
Basic   *
Governor adjustment_02
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   8 6 10
Governor adjustment_03
Pump speed r/min   450 450 450
Average injection quantity mm3/st.   4
Timer adjustment
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   42 42
Basic   *
Speed control lever angle
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   0 0 0
Remarks
Magnet OFF
 
0000000901
Pump speed r/min   1500 1500 1500
Overflow quantity cm3/min   460 330 590
Stop lever angle
Pump speed r/min   1500 1500 1500
Pressure kPa   578.5 549 608
Pressure kgf/cm2   5.9 5.6 6.2
Basic   *
Stop lever angle_02
Pump speed r/min   500 500 500
Pressure kPa   294.5 265 324
Pressure kgf/cm2   3 2.7 3.3
Stop lever angle_03
Pump speed r/min   1500 1500 1500
Pressure kPa   578.5 549 608
Pressure kgf/cm2   5.9 5.6 6.2
Stop lever angle_04
Pump speed r/min   2125 2125 2125
Pressure kPa   745.5 716 775
Pressure kgf/cm2   7.6 7.3 7.9
0000001101
Pump speed r/min   1500 1500 1500
Timer stroke mm   4.7 4.5 4.9
Basic   *
_02
Pump speed r/min   1250 1250 1250
Timer stroke mm   3.5 2.9 4.1
_03
Pump speed r/min   1500 1500 1500
Timer stroke mm   4.7 4.4 5
_04
Pump speed r/min   2125 2125 2125
Timer stroke mm   7.6 7 8.2
0000001201
Max. applied voltage V   8 8 8
Test voltage V   13 12 14
0000001501
Pump speed r/min   1500 1500 1500
Atmospheric pressure difference kPa   -18.7 -18.7 -18.7
Atmospheric pressure difference mmHg   -140 -140 -140
Average injection quantity mm3/st.   32.9 31.9 33.9
Basic   *
Timing setting
K dimension mm   3.3 3.2 3.4
KF dimension mm   5.8 5.7 5.9
MS dimension mm   1.5 1.4 1.6
Control lever angle alpha deg.   35 31 39
Control lever angle beta deg.   45 40 50

Test data Ex:

0000001801 M-CSD ADJUSTMENT

Test data 104748-0261
M-CSD adjustment 1. Fixing the M-CSD (1)At roller holder advance angle a adjust the lever shaft ball pin so that it contacts the roller holder. (2)At this time, adjust the position of the M-CSD lever (A) using adjusting screw (C) so that the clearance L between the M-CSD lever (A) and the stopper (B) becomes L1. Then fix using nut (D). T1T1 2. Fixing CSD lever plate (E) (1)Make the clearance between the CSD lever (A) and the stopper (B) L2. (2)Fix the CSD lever plate (E) using the bolt (F) so that the clearance between the intermediate lever (G)'s roller (H) and the CSD lever plate is L3. T2T2 3. Fixing the FICD screw (I) (1)Move the CSD lever (A) through its full stroke. (2)Adjust the intermediate lever (G)'s FICD screw (I) so that the control lever (K)'s position is a [the clearance from screw (I) is L4]. Then fix using nut (J). T1T1 Control lever position b, L4
----------
L1=0.5+2mm L2=0mm L3=4.0mm L4=3.8+-0.5mm T1=6~9Nm(0.6~0.9kgfm) T2=3.4~4.9Nm(0.35~0.5kgfm) a=0deg b=7deg
----------
T1=6~9Nm(0.6~0.9kgfm) T2=3.4~4.9Nm(0.35~0.5kgfm) L1=0.5+2mm L3=4mm L4=6.2+-1mm b=7deg

0000001901 ANEROID COMPENSATOR

Test data 104748-0261
ACS adjustment Full load injection quantity at high altitudes and ACS adjusting method 1. Full load injection quantity adjustment (1)Remove the ACS cover and remove the bellows and adjusting shim. (2)Perform all adjustments as per the adjustment standard except for ACS adjustment. 2. ACS adjustment (1)Assemble the ACS cover, bellows and adjusting shim. (2)At pump speed N1, adjust using a shim to obtain the decrease for the altitude shown in the table. X1 = atmospheric pressure X2 = altitude Y = decrease quantity (A) = adjustment value (B) = test value
----------
N1=1500r/min
----------




Have questions with 104748-0261?





Group cross 104748-0261 ZEXEL

Mazda 

 
R22913800A 
INJECTION-PUMP ASSEMBLY
R2
104748-0261  

104748-0265 
 
 
INJECTION-PUMP ASSEMBLY
R2
9 460 612 553 
 
INJECTION-PUMP ASSEMBLY
9 460 612 554 
 
INJECTION-PUMP ASSEMBLY
9 460 612 555 
 
INJECTION-PUMP ASSEMBLY

Mazda 

9 460 614 615 
R22913800B 
INJECTION-PUMP ASSEMBLY
R2
Back to top