101901-1190 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1019011190


101901-1190 INJECTION-PUMP ASSEMBLY
Rating:
77
Buy INJECTION-PUMP ASSEMBLY 101901-1190 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 101901-1190 1019011190

Cross reference number

ZEXEL 101901-1190 1019011190


Zexel num
Bosch num
Firm num
Name
101901-1190 
101901-1191 
 
  MITSUBISHI
INJECTION-PUMP ASSEMBLY
10DC8 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-8- 5-6-3-4- 9-10
Pre-stroke mm   4.5 4.45 4.55
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   72 71.5 72.5
Difference between angles 3
Cal 1-8
deg.   117 116.5 117.5
Difference between angles 4
Cal 1-5
deg.   144 143.5 144.5
Difference between angles 5
Cal 1-6
deg.   189 188.5 189.5
Difference between angles 6
Cal 1-3
deg.   216 215.5 216.5
Difference between angles 7
Cal 1-4
deg.   261 260.5 261.5
Difference between angles 8
Cal 1-9
deg.   288 287.5 288.5
Difference between angles 9
Cal 1-10
deg.   333 332.5 333.5
Injection quantity adjustment
Adjusting point   -
Rack position   10.1
Pump speed r/min   800 800 800
Each cylinder's injection qty mm3/st.   114 110.8 117.2
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   8.4+-0.5
Pump speed r/min   200 200 200
Each cylinder's injection qty mm3/st.   20 17 23
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R(10.1+- 0.5)
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   114 113 115
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R(10.1+- 0.5)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   116.5 111.7 121.3
Difference in delivery mm3/st.   9.3 9.3 9.3
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   160 140 180
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   375+120
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   700
Advance angle deg.   2.6 2.1 3.1
Timer adjustment_03
Pump speed r/min   900
Advance angle deg.   4.2 3.7 4.7
Timer adjustment_04
Pump speed r/min   1150
Advance angle deg.   6.5 6 7
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101901-1190
N:Pump speed R:Rack position (mm) (1)Beginning of damper spring operation: DL (2)Excess fuel setting for starting: SXL
----------
DL=8-0.2mm SXL=10.1+0.2mm
----------

0000000901

Test data 101901-1190
F:Full load I:Idle
----------

----------
a=5.5deg+-5deg b=26deg+-3deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325+10r/min Ra=8.4mm
----------

0000001601 2-STAGE CHANGEOVER DEVICE

Test data 101901-1190
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------




Have questions with 101901-1190?





Group cross 101901-1190 ZEXEL

Mitsubishi 

 
3196141031 

10DC8
 
3196142041 

10DC8
 
3196171030 
INJECTION-PUMP ASSEMBLY
10DC80
 
3196171012 

 
3196171022 

 
3196141032 

 
3196142042 

 
3196171031 

 
 
INJECTION-PUMP ASSEMBLY
10DC8
 
3196171013 
INJECTION-PUMP ASSEMBLY
10DC8
101901-1190  

101901-1191 
 
 
INJECTION-PUMP ASSEMBLY
10DC8
 
3196171023 
INJECTION-PUMP ASSEMBLY
10DC8
Back to top