Rating:
Information injection-pump assembly
BOSCH
F 019 Z10 296
f019z10296
ZEXEL
101608-6443
1016086443
Service parts 101608-6443 INJECTION-PUMP ASSEMBLY:
1.
_
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
ME440837
12.
Open Pre:MPa(Kqf/cm2)
21.6(220)
15.
NOZZLE SET
Include in #1:
101608-6443
as INJECTION-PUMP ASSEMBLY
Include in #2:
104749-0850
as _
Cross reference number
BOSCH
F 019 Z10 296
f019z10296
ZEXEL
101608-6443
1016086443
Zexel num
Bosch num
Firm num
Name
101608-6443
F 019 Z10 296
INJECTION-PUMP ASSEMBLY
6D34TL 14BE INJECTION PUMP ASSY PE6A PE
6D34TL 14BE INJECTION PUMP ASSY PE6A PE
F 019 Z10 296
ME441273 MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D34TL * K 14BE INJECTION PUMP ASSY PE6A PE
6D34TL * K 14BE INJECTION PUMP ASSY PE6A PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-5520
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
3.5
3.45
3.55
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
10.3
Pump speed
r/min
1000
1000
1000
Average injection quantity
mm3/st.
85.5
84.5
86.5
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the lever
*
Boost pressure
kPa
66
66
Boost pressure
mmHg
495
495
Injection quantity adjustment_02
Adjusting point
-
Rack position
7.9+-0.5
Pump speed
r/min
490
490
490
Average injection quantity
mm3/st.
8
6.7
9.3
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
E
Rack position
10.8++
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
70
70
75
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Rack limit
*
Boost compensator adjustment
Pump speed
r/min
750
750
750
Rack position
R1-0.8
Boost pressure
kPa
28
21.3
34.7
Boost pressure
mmHg
210
160
260
Boost compensator adjustment_02
Pump speed
r/min
750
750
750
Rack position
R1(10.3)
Boost pressure
kPa
56.7
54
59.4
Boost pressure
mmHg
425
405
445
Timer adjustment
Pump speed
r/min
0
Advance angle
deg.
3
2
3
Load
0/4
Timer adjustment_02
Pump speed
r/min
650+-25
Advance angle
deg.
3
2
3
Load
0/4
Remarks
Start
Start
Timer adjustment_03
Pump speed
r/min
750+-25
Advance angle
deg.
0
0
0
Load
0/4
Remarks
Finish
Finish
Test data Ex:
Governor adjustment
N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)RACK LIMIT
(4)Torque control stroke: L1 (N = N1 and N = N2 rack difference).
(5)Boost compensator stroke: BCL
(6)Main spring setting
(7)Set idle sub-spring
----------
K=9 L1=0.3+-0.1mm N1=750r/min N2=300r/min BCL=0.8+-0.1mm
----------
----------
K=9 L1=0.3+-0.1mm N1=750r/min N2=300r/min BCL=0.8+-0.1mm
----------
Speed control lever angle
F:Full speed
I:Idle
S:Stop
(1)Base lever only
(2)Stopper bolt setting
----------
----------
a=3deg+-5deg b=35deg+-3deg c=15deg+-5deg
----------
----------
a=3deg+-5deg b=35deg+-3deg c=15deg+-5deg
Stop lever angle
N:Pump normal
S:Stop the pump.
(1)Normal
(2)Rack position = aa, speed = bb (stamp at delivery)
(3)Use the hole above R = cc
----------
aa=1-0.5mm bb=0r/min cc=25mm
----------
a=21deg+-5deg b=(55deg)
----------
aa=1-0.5mm bb=0r/min cc=25mm
----------
a=21deg+-5deg b=(55deg)
0000001501 TAMPER PROOF
Tamperproofing-equipped boost compensator cover installation procedure
(A) After adjusting the boost compensator, tighten the bolts to remove the heads.
(1)Before adjusting the governor and the boost compensator, tighten the screw to the specified torque.
(Tightening torque T = T1 maximum)
(2)After adjusting the governor and the boost compensator, tighten to the specified torque to break off the bolt heads.
(Tightening torque T = T2)
----------
T1=2.5N-m(0.25kgf-m) T2=2.9~4.4N-m(0.3~0.45kgf-m)
----------
----------
T1=2.5N-m(0.25kgf-m) T2=2.9~4.4N-m(0.3~0.45kgf-m)
----------
Timing setting
(1)Pump vertical direction
(2)Position of gear mark '3' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=10deg
----------
a=(130deg)
----------
aa=10deg
----------
a=(130deg)
Have questions with 101608-6443?
Group cross 101608-6443 ZEXEL
101608-6443
F 019 Z10 296
INJECTION-PUMP ASSEMBLY
6D34TL
6D34TL