101608-1120 ZEXEL 9 400 615 777 BOSCH INJECTION-PUMP ASSEMBLY 9400615777 1016081120 me075721


101608-1120 INJECTION-PUMP ASSEMBLY
Rating:
29
Buy INJECTION-PUMP ASSEMBLY 101608-1120 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 615 777 9400615777
ZEXEL 101608-1120 1016081120
MITSUBISHI ME075721 me075721

Service parts 101608-1120 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-8391
3. GOVERNOR 105931-9400
4. SUPPLY PUMP 105210-4661
5. AUTOM. ADVANCE MECHANIS 105643-1090
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105110-7062
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/21.6{220}
13. NOZZLE-HOLDER 105041-3031
14. NOZZLE
15. NOZZLE SET 105019-0230

Include in #1:

101608-1120 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

BOSCH 9 400 615 777 9400615777
ZEXEL 101608-1120 1016081120
MITSUBISHI ME075721 me075721


Zexel num
Bosch num
Firm num
Name
101608-1120 
9 400 615 777 
ME075721  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D17 K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-8420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   12
Pump speed r/min   850 850 850
Each cylinder's injection qty mm3/st.   85.1 82.5 87.7
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   9.5+-0.5
Pump speed r/min   800 800 800
Each cylinder's injection qty mm3/st.   10.8 9.2 12.4
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12)
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   85.1 84.1 86.1
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.85
Pump speed r/min   1450 1450 1450
Average injection quantity mm3/st.   99.9 95.9 103.9
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   91 81 101
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1150--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1100
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1450
Advance angle deg.   6 5.5 6.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101608-1120
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT
----------
T1=G43
----------

Speed control lever angle

Test data 101608-1120
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=40mm
----------
a=18.5deg+-5deg b=(42deg)+-3deg

Stop lever angle

Test data 101608-1120
N:Engine manufacturer's normal use S:Stop the pump. (1)Set the stopper bolt at pump speed = aa and rack position = bb (non-injection rack position). Confirm non-injection. (2)After setting the stopper bolt, confirm non-injection at speed cc. Rack position = dd (non-injection rack position). (3)Rack position = approximately ee (speed lever full, speed = ff). (4)Free (at delivery)
----------
aa=1450r/min bb=7.2-0.5mm cc=275r/min dd=(8.8)mm ee=15mm ff=0r/min
----------
a=36.5deg+-5deg b=(25deg) c=13deg+-5deg

0000001501 LEVER

Test data 101608-1120
(A) Idle (B) Full speed (C) Base lever (D) Accelerator lever (E) Accelerator lever delivery position 1. Measure speed lever angle (1)Measure the angle when the accelerator lever (D) contacted the base lever (C) at a.
----------

----------
b=(42deg)+-3deg c=18.5deg+-5deg

0000001601 LEVER

Test data 101608-1120
(A) Accelerator lever stopper bolt (B) Link (c) Nut (D) Lever (E) Pin (f) lever (G) Stopper bolt (H) Return spring (J) Pin (E) contacts lever. (K) Load sensor terminal (1)Black (2)Blue-yellow (3)Blue-red Setting the accelerator lever angle, load sensor adjustment 1. Accelerator lever setting method (1)Position the speed lever against the idle stopper bolt and fix. (2)Screw in the accelerator lever stopper bolt (A) and back off the stopper bolt (A) from the position where the accelerator lever pin contacts the speed lever and set. (Gap: approx. 1 mm) Tightening torque: 4.9~7 N.m {0.5~0.7 kgf.m} 2. Load sensor adjustment (See fig 1) (1)Load sensor output measuring circuit Apply DC5+-0.01V to the load sensor terminals and measure the output voltage. (2)Load sensor output adjustment procedure Hold the speed lever against the full side stopper bolt and fix. Adjust the load sensor output voltage to VF = 0.417+-0.1 V using the link (B) and then fix temporarily using nut (C). Turn the speed lever from the idle side to the full side and confirm that output voltage VF = 0.417+-0.1 V is obtained. Confirm several times and then fix using nut (C). Tightening torque: 3.4~4.9 N.m {0.35~0.5 kgf.m} 3. Setting the step motor's idle side stopper bolt After adjustment in previous 1 and 2, position speed lever against idle stopper bolt and fix. Then, screw in stopper bolt G until step motor lever D's pin E contacts lever F. Back off 10+2 deg (approx. 3.5 mm) from this position and fix G. (See fig. 3) 4. Speed lever return confirmation (1)Remove return spring (H) and confirm that the speed lever is returned to the idle position by the torsion spring. (2)Reinstall the return spring (H) in its original position.
----------

----------

Timing setting

Test data 101608-1120
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=10deg
----------
a=(2deg)




Have questions with 101608-1120?





Group cross 101608-1120 ZEXEL

Mitsubishi 

9 400 615 775 
ME075718 
INJECTION-PUMP ASSEMBLY
6D17
9 400 615 776 
ME075719 
INJECTION-PUMP ASSEMBLY
6D17
101608-1120  
9 400 615 777 
ME075721 
INJECTION-PUMP ASSEMBLY
6D17
9 400 615 778 
ME075722 
INJECTION-PUMP ASSEMBLY
6D17
9 400 619 487 
 
INJECTION-PUMP ASSEMBLY
9 400 619 488 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 779 
ME075639 
INJECTION-PUMP ASSEMBLY
6D16
9 400 619 489 
 
INJECTION-PUMP ASSEMBLY
9 400 619 490 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 780 
ME075640 
INJECTION-PUMP ASSEMBLY
6D16
9 400 619 491 
 
INJECTION-PUMP ASSEMBLY
9 400 619 492 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 781 
ME075641 
INJECTION-PUMP ASSEMBLY
6D16
9 400 619 493 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 782 
ME075642 
INJECTION-PUMP ASSEMBLY
6D17-2
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 783 
ME075643 
INJECTION-PUMP ASSEMBLY
6D17-2
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 784 
ME075644 
INJECTION-PUMP ASSEMBLY
6D17-2
Back to top