101607-1590 ZEXEL 9 400 615 626 BOSCH INJECTION-PUMP ASSEMBLY 9400615626 1016071590 me056896


101607-1590 INJECTION-PUMP ASSEMBLY
Rating:
54
Buy INJECTION-PUMP ASSEMBLY 101607-1590 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 615 626 9400615626
ZEXEL 101607-1590 1016071590
MITSUBISHI ME056896 me056896

Include in #1:

Cross reference number

BOSCH 9 400 615 626 9400615626
ZEXEL 101607-1590 1016071590
MITSUBISHI ME056896 me056896


Zexel num
Bosch num
Firm num
Name
101607-1590 
9 400 615 626 
ME056896  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D22 * K 14BE INJECTION PUMP ASSY PE6A PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5120
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.5 4.45 4.55
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   9.6
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   112 108.6 115.4
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   8+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   18.5 15.7 21.3
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(9.6)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   112 111 113
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(9.6)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   113.5 111 116
Difference in delivery mm3/st.   9 9 9
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   170 150 190
Fixing the lever   *
Remarks
After startup boost setting
 
Injection quantity adjustment_06
Adjusting point   F
Rack position   R2(9.3)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   104 103 105
Fixing the lever   *
Remarks
Adjust using 2-stage changeover device.
 
Timer adjustment
Pump speed r/min   850--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   800
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1000
Advance angle deg.   0.9 0.4 1.4
Timer adjustment_04
Pump speed r/min   1150
Advance angle deg.   3 2.5 3.5
Timer adjustment_05
Pump speed r/min   -
Advance angle deg.   4 4 5
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 101607-1590
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Tolerance for racks not indicated: +-0.05mm. (4)Excess fuel setting for starting: SXL (5)Damper spring setting (6)When air cylinder is operating.
----------
SXL=11.6+-0.1mm
----------

Speed control lever angle

Test data 101607-1590
F:Full speed I:Idle (1)Pump speed = aa (2)Pump speed = bb (3)Pump speed cc (4)Air cylinder's adjustable range
----------
aa=1165r/min bb=300r/min cc=1150r/min
----------
a=2deg+-5deg b=10deg+-5deg c=20deg+-5deg d=(2deg)

0000000901

Test data 101607-1590
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=21deg+-5deg b=23deg+-3deg

Stop lever angle

Test data 101607-1590
N:Engine manufacturer's normal use S:Stop the pump. (1)Free (at shipping) (2)Rack position = aa (3)Rack position bb (4)Stopper bolt setting
----------
aa=13.5mm bb=6-0.5mm
----------
a=(52deg) b=30deg+7deg-5deg c=24deg+-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325r/min Ra=7.3+-0.1mm
----------

0000001601 2-STAGE CHANGEOVER DEVICE

Test data 101607-1590
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------

0000001701 ACS

Test data 101607-1590
Aneroid compensator adjustment (1)Adjust the clearance between the aneroid compensator's main body and the push rod to L1. (2)Pump speed N1 at load lever's full position. (3)Screw in the aneroid compensator body to obtain the performance shown in the graph above.
----------
L1=0.1~0.5mm N1=700r/min
----------
Ra=R1(9.6)mm Rb=R1-0.9mm P1=(88.8)kPa((666)mmHg) P2=69.3+-0.7kPa(520+-5mmHg) Q1=112+-1cm3/1000st Q2=-

Timing setting

Test data 101607-1590
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(7deg)




Have questions with 101607-1590?





Group cross 101607-1590 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 621 
ME076734 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 622 
ME076736 
INJECTION-PUMP ASSEMBLY
6D14
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

 
ME076737 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

 
ME076738 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

 
ME076739 
INJECTION-PUMP ASSEMBLY
6D16
 
ME076740 
INJECTION-PUMP ASSEMBLY
6D14
F 019 Z10 836 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 623 
ME086676 
INJECTION-PUMP ASSEMBLY
6D31
F 019 Z10 608 
 
INJECTION-PUMP ASSEMBLY
9 400 619 760 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 624 
ME076741 
INJECTION-PUMP ASSEMBLY
6D17
9 400 619 603 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 625 
ME076753 
INJECTION-PUMP ASSEMBLY
6D16
101607-1590  
9 400 615 626 
ME056896 
INJECTION-PUMP ASSEMBLY
6D22
Back to top