101606-1832 ZEXEL 9 400 615 468 BOSCH INJECTION-PUMP ASSEMBLY 9400615468 1016061832 me076222


101606-1832 INJECTION-PUMP ASSEMBLY
Rating:
81
Buy INJECTION-PUMP ASSEMBLY 101606-1832 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 615 468 9400615468
ZEXEL 101606-1832 1016061832
MITSUBISHI ME076222 me076222

Service parts 101606-1832 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-9841
3. GOVERNOR 105490-5501
4. SUPPLY PUMP 105210-4641
5. AUTOM. ADVANCE MECHANIS 105643-0440
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6030
11. Nozzle and Holder ME035655
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105031-3900
14. NOZZLE 105015-5700
15. NOZZLE SET

Include in #1:

101606-1832 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 615 468 9400615468
ZEXEL 101606-1832 1016061832
MITSUBISHI ME076222 me076222


Zexel num
Bosch num
Firm num
Name
101606-1832 
9 400 615 468 
ME076222  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D14 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.3 3.25 3.35
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   10.6
Pump speed r/min   850 850 850
Each cylinder's injection qty mm3/st.   65 63 67
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   9.2+-0.5
Pump speed r/min   275 275 275
Each cylinder's injection qty mm3/st.   8 6.8 9.2
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(10.6)
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   65 64 66
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(10.6)
Pump speed r/min   1450 1450 1450
Average injection quantity mm3/st.   74 70 78
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   F
Rack position   11.2+-0. 1
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   63 59 67
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   1250--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1200
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101606-1832
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Lever ratio: RT (4)Target shim dimension: TH (5)Tolerance for racks not indicated: +-0.05mm. (6)Excess fuel setting for starting: SXL (7)Damper spring setting (8)When air cylinder is operating.
----------
RT=1 TH=2.4mm SXL=11.2+-0.1mm
----------

Speed control lever angle

Test data 101606-1832
F:Full speed I:Idle (1)Pump speed = aa (2)Pump speed = bb (3)Pump speed cc
----------
aa=325r/min bb=(920)r/min cc=(1570)r/min
----------
a=(11deg)+-5deg b=21deg+-5deg c=13deg+-5deg

0000000901

Test data 101606-1832
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=18.5deg+-3deg b=30deg+-5deg

Stop lever angle

Test data 101606-1832
S:Stop the pump. (1)Free (at shipping) (2)Rack position = aa
----------
aa=6.3-0.5mm
----------
a=1deg+-5deg b=52deg+7deg-5deg

0000001201

Test data 101606-1832
(1)Minimum - maximum speed specification (2)Variable speed specification (3)Use the hole at R = aa
----------
aa=70mm
----------
a=33deg+-3deg b=30deg+-5deg

0000001501 2-STAGE CHANGEOVER DEVICE

Test data 101606-1832
RFD governor 2 stage changeover mechanism adjustment outline (A) Bolt (B) bolt (c) Nut (D) Return spring (E) Bolt (F) Bolt (G) Screw (H) Bolt (I) Load lever (J) Speed lever (K) Air cylinder (M Air inlet Figure 1 is only for reference. Lever shape, etc, may vary. 1. Minimum-maximum speed specification adjustment (when running) (a) Without applying air to the air cylinder, loosen bolts (A) and (B). (1)High speed return L setting (a) In the speed range Nf~Nf - 300r/min, adjust using the speed adjusting bolt to determine the temporary beginning of high speed control speed. (b) Determine the rack position in the vicinity of Rf using the full load lever. (c) Increase speed and confirm return distance L. (d) Adjust using the tension lever bolt to obtain L. (2)Setting full load rack position Rf (a) Move the load control lever to the full side. (b) Adjust the full load adjusting bolt so that Rf can be obtained, then fix. (3)Setting the beginning of high speed operation Nf (a) Adjust using bolt (E) so that Nf can be obtained, and then fix. (4)Idle control setting (Re, Ni, Rc) (a) Set the speed at Ns + 200r/min and move the load control lever to the idle side. (b) Fix the lever in the position where Re can be obtained. (c) Next, decrease speed to Ni and screw in the idle spring. (d) Adjust to obtain rack position Ri. (e) Increase the speed and after confirming that the rack position is Re at Ns, set the speed at 0. (f) Confirm protrusion position Rc at idle. (5)Damper spring adjustment (a) Increase speed and set the speed at the rack position Rd - 0.1 mm (b) Set using the damper spring so that the rack position Rd can be obtained. (c) When Rd is not specified, Rd = Ri - 0.5 mm. (6)High speed droop confirmation (a) Return the load control lever to the full load lever position. (b) Increase the speed and confirm that Rf can be obtained at Nf r/min. (c) Confirm that speed is Nh at rack position Rh. 2. Variable speed specification adjustment (at operation) (a) Remove return spring (D). (b) Apply air pressure of 245~294 kPa {2.5~3 kg/cm2} to the air cylinder. (c) Perform the following adjustment in this condition. (1)Setting full load rack position Rf' (a) Pull the load lever to the idle side. (b) Obtain rack position Rf' using the nut (C). (Pump speed is Nf'-50 r/min.) (2)Setting full speed Nf' (a) Adjust using bolt (B) so that Nf can be obtained, and then fix. (3)Low speed side setting (a) At 350r/min, set bolt (F) at beginning of governor operation position, then fix. 3. Bolt (A) adjustment (1)Install return spring (D) and perform the adjustments below at air pressure 0. (a) Set at speed Nf using bolt (E). (b) Screw in bolt (A). (c) Screw in 1 more turn from the speed lever contact position (d) Fix bolt (A). (e) At this time confirm that the air cylinder's shaft moves approximately 1 mm towards the governor. 4. Lever operation confirmation using the air cylinder (1)Apply 588 kPa {6 kg/cm2} air pressure to the air cylinder. (2)Confirm that the cylinder piston is moved 50 mm by the spring (D).
----------

----------

0000001601 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=400r/min Ra=8.9+-0.1mm
----------

Timing setting

Test data 101606-1832
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=14deg
----------
a=(0deg)




Have questions with 101606-1832?





Group cross 101606-1832 ZEXEL

Mitsubishi 

 
ME076231 
INJECTION-PUMP ASSEMBLY
6D15T2
 
ME076225 
INJECTION-PUMP ASSEMBLY
6D14T
101606-1832  
9 400 615 468 
ME076222 
INJECTION-PUMP ASSEMBLY
6D14
9 400 615 469 
ME076221 
INJECTION-PUMP ASSEMBLY
6D14
9 400 615 470 
ME076233 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 471 
ME076279 
INJECTION-PUMP ASSEMBLY
6D14T
9 400 615 472 
ME076283 
INJECTION-PUMP ASSEMBLY
6D15T2
9 400 615 473 
ME076285 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY
6D14
9 400 615 474 
ME076278 
INJECTION-PUMP ASSEMBLY
6D14
Back to top