Rating:
Information injection-pump assembly
BOSCH
F 01G 09U 1BM
f01g09u1bm
ZEXEL
101606-0583
1016060583
ISUZU
1156035013
1156035013
Service parts 101606-0583 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
12.
Open Pre:MPa(Kqf/cm2)
16.7(170)/19.6(200)
14.
NOZZLE
Include in #1:
101606-0583
as INJECTION-PUMP ASSEMBLY
Include in #2:
104746-6232
as _
Cross reference number
BOSCH
F 01G 09U 1BM
f01g09u1bm
ZEXEL
101606-0583
1016060583
ISUZU
1156035013
1156035013
Zexel num
Bosch num
Firm num
Name
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
134424-4120
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
255
255
255
Tester oil delivery pressure
kgf/cm2
2.6
2.6
2.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
4.2
4.15
4.25
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
10.5
Pump speed
r/min
1100
1100
1100
Average injection quantity
mm3/st.
102
100.5
103.5
Max. variation between cylinders
%
0
-2
2
Basic
*
Fixing the lever
*
Boost pressure
kPa
109
109
Boost pressure
mmHg
820
820
Injection quantity adjustment_02
Adjusting point
-
Rack position
7.5+-0.5
Pump speed
r/min
440
440
440
Average injection quantity
mm3/st.
12
10.7
13.3
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Boost compensator adjustment
Pump speed
r/min
550
550
550
Rack position
9.3
Boost pressure
kPa
36.7
32.7
40.7
Boost pressure
mmHg
275
245
305
Boost compensator adjustment_02
Pump speed
r/min
550
550
550
Rack position
(10.5)
Boost pressure
kPa
96
96
96
Boost pressure
mmHg
720
720
720
Timer adjustment
Pump speed
r/min
1300++
Advance angle
deg.
0
0
0
Remarks
Do not advance until starting N = 1300.
Do not advance until starting N = 1300.
Timer adjustment_02
Pump speed
r/min
-
Advance angle
deg.
1
1
1
Remarks
Measure the actual speed, stop
Measure the actual speed, stop
Test data Ex:
Governor adjustment
N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Set idle sub-spring
(4)Main spring setting
(5)Boost compensator stroke: BCL
----------
K=11 BCL=(1.2)mm
----------
----------
K=11 BCL=(1.2)mm
----------
Speed control lever angle
F:Full speed
I:Idle
(1)Stopper bolt setting
----------
----------
a=9deg+-5deg b=23deg+-5deg
----------
----------
a=9deg+-5deg b=23deg+-5deg
Stop lever angle
N:Pump normal
S:Stop the pump.
(1)Normal
----------
----------
a=53deg+-5deg b=45deg+-5deg
----------
----------
a=53deg+-5deg b=45deg+-5deg
0000001501 TAMPER PROOF
Tamperproofing-equipped boost compensator cover installation procedure
(1)Before adjusting the governor and the boost compensator, temporarily tighten the screw to the specified torque. (Do not damage the thread.)
(Tightening torque T = T1 maximum)
(2)After adjusting the governor and the boost compensator, tighten to the specified torque to break off the bolt heads.
(Tightening torque T = T2)
----------
T1=2.5N-m(0.25kgf-m) T2=29.4~39.2N-m(3~4kgf-m)
----------
----------
T1=2.5N-m(0.25kgf-m) T2=29.4~39.2N-m(3~4kgf-m)
----------
Timing setting
(1)Pump vertical direction
(2)Positions of coupling's threaded installation holes at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=6deg
----------
a=(90deg)
----------
aa=6deg
----------
a=(90deg)