101603-7170 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016037170 1156024870


101603-7170 INJECTION-PUMP ASSEMBLY
Rating:
65
Buy INJECTION-PUMP ASSEMBLY 101603-7170 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 101603-7170 1016037170
ISUZU 1156024870 1156024870

Cross reference number

ZEXEL 101603-7170 1016037170
ISUZU 1156024870 1156024870


Zexel num
Bosch num
Firm num
Name
101603-7170 
101603-7172 
 
1156024870  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.6
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   74.8 73.2 76.4
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   8 6.7 9.3
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.6)
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   74.8 73.8 75.8
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.35
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   87.3 83.3 91.3
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   93 93 101
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1275--
Advance angle deg.   0 0 0
Load   3/4
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1225
Advance angle deg.   0.5
Load   3/4
Timer adjustment_03
Pump speed r/min   1275
Advance angle deg.   0.5
Load   4/4
Timer adjustment_04
Pump speed r/min   1500
Advance angle deg.   5.5 5 6
Load   4/4
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101603-7170
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT
----------
T1=C90
----------

Speed control lever angle

Test data 101603-7170
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=48mm
----------
a=42deg+-5deg b=(38deg)+-3deg

Stop lever angle

Test data 101603-7170
N:Pump normal S:Stop the pump.
----------

----------
a=25deg+-5deg b=40deg+-5deg

0000001501 RACK SENSOR

Test data 101603-7170
V1:Supply voltage V2f:Full side output voltage V2i:Idle side output voltage (A) Black (B) Yellow (C) Red (D) Trimmer (E): Shaft (F) Nut (G) Load lever 1. Load sensor adjustment (1)Connect as shown in the above diagram and apply supply voltage V1. (2)Hold the load lever (G) against the full side. (3)Turn the shaft so that the voltage between (A) and (B) is V2. (4)Hold the load lever (G) against the idle side. (5)Adjust (D) so that the voltage between (A) and (B) is V2i. (6)Repeat the above adjustments. (7)Tighten the nut (F) at the point satisfying the standards. (8)Hold the load lever against the full side stopper and the idle side stopper. (9)At this time, confirm that the full side output voltage is V2f and the idle side output voltage is V2i.
----------
V1=5+-0.02V V2f=0.15+0.03V V2i=2.35-0.03V
----------

Timing setting

Test data 101603-7170
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(60deg)




Have questions with 101603-7170?





Group cross 101603-7170 ZEXEL

Isuzu 

9 400 615 160 
1156025340 
INJECTION-PUMP ASSEMBLY
6SA1-T
9 400 615 161 
1156025350 
INJECTION-PUMP ASSEMBLY
6SA1-T
9 400 611 257 
1156025360 
INJECTION-PUMP ASSEMBLY
6SA1-T
 
1156025370 
INJECTION-PUMP ASSEMBLY
6SA1-T
9 400 615 162 
1156025371 
INJECTION-PUMP ASSEMBLY
6SA1-T
9 400 612 165 
1156025380 
INJECTION-PUMP ASSEMBLY
6SA1-T
9 400 615 163 
 
INJECTION-PUMP ASSEMBLY
6SA1-T

Isuzu 

9 400 615 163 
1156025390 
INJECTION-PUMP ASSEMBLY
6SA1-T
9 400 615 164 
1156025400 
INJECTION-PUMP ASSEMBLY
6SA1-T
101603-7170  

101603-7172 
 
1156024870 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156024871 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156024872 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 619 552 
1156025190 
INJECTION-PUMP ASSEMBLY
6QA1
9 400 615 165 
1156025191 
INJECTION-PUMP ASSEMBLY
6QA1
9 400 619 722 
1156025200 
INJECTION-PUMP ASSEMBLY
6QA1
9 400 615 166 
1156025201 
INJECTION-PUMP ASSEMBLY
6QA1
Back to top