Rating:
Information injection-pump assembly
BOSCH
9 400 619 678
9400619678
ZEXEL
101433-9510
1014339510
Service parts 101433-9510 INJECTION-PUMP ASSEMBLY:
1.
_
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
1660090019
12.
Open Pre:MPa(Kqf/cm2)
9.8{100}
15.
NOZZLE SET
Include in #1:
101433-9510
as INJECTION-PUMP ASSEMBLY
Include in #2:
104242-1040
as _
Cross reference number
BOSCH
9 400 619 678
9400619678
ZEXEL
101433-9510
1014339510
Zexel num
Bosch num
Firm num
Name
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
2.3
2.25
2.35
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
A
Rack position
14.1
Pump speed
r/min
1550
1550
1550
Average injection quantity
mm3/st.
35.7
34.7
36.7
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
B
Rack position
10.8+-0.
5
Pump speed
r/min
300
300
300
Average injection quantity
mm3/st.
7.5
6.5
8.5
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Timer adjustment
Pump speed
r/min
500
Advance angle
deg.
0.5
Timer adjustment_02
Pump speed
r/min
550
Advance angle
deg.
0.7
Timer adjustment_03
Pump speed
r/min
700
Advance angle
deg.
1
0.5
1.5
Timer adjustment_04
Pump speed
r/min
900
Advance angle
deg.
2
1.5
2.5
Timer adjustment_05
Pump speed
r/min
1100
Advance angle
deg.
3
2.5
3.5
Timer adjustment_06
Pump speed
r/min
1300
Advance angle
deg.
4
3.5
4.5
Timer adjustment_07
Pump speed
r/min
1500
Advance angle
deg.
5
4.5
5.5
Remarks
Finish
Finish
Test data Ex:
Governor adjustment
N:Pump speed
R:Rack position (mm)
(1)Target notch: K
----------
K=7
----------
----------
K=7
----------
Speed control lever angle
F:Full speed
I:Idle
S:Stop
----------
----------
a=(28deg)+-5deg b=(34deg)+-5deg c=32deg+-3deg
----------
----------
a=(28deg)+-5deg b=(34deg)+-5deg c=32deg+-3deg
Stop lever angle
N:Pump normal
S:Stop the pump.
----------
----------
a=10deg+-5deg b=53deg+-5deg
----------
----------
a=10deg+-5deg b=53deg+-5deg
0000001501 GOV FULL LOAD ADJUSTMENT
Title1:Full load stopper adjustment
Title2:Governor set speed
LABEL1:Distinguishing
LABEL2:Pump speed (r/min)
LABEL3:Ave. injection quantity (mm3/st)
LABEL4:Max. var. bet. cyl.
LABEL5:Remarks
LABEL6:Distinguishing
LABEL7:Governor set speed (r/min)
LABEL8:Remarks
(1)Adjustment conditions are the same as those for measuring injection quantity.
(2)-
----------
----------
a1=M a2=F a3=WD a4=WE a5=- r1=1550r/min r2=1550r/min r3=1550r/min r4=1550r/min r5=- Q1=35.7+-1mm3/st Q2=33.6+-1mm3/st Q3=35.7+-1mm3/st Q4=33.6+-1mm3/st Q5=- c1=+-2.5% c2=+-2.5% c3=+-2.5% c4=+-2.5% c5=- a6=- a7=- a8=- a9=- a10=- r6=- r7=- r8=- r9=- r10=-
----------
----------
a1=M a2=F a3=WD a4=WE a5=- r1=1550r/min r2=1550r/min r3=1550r/min r4=1550r/min r5=- Q1=35.7+-1mm3/st Q2=33.6+-1mm3/st Q3=35.7+-1mm3/st Q4=33.6+-1mm3/st Q5=- c1=+-2.5% c2=+-2.5% c3=+-2.5% c4=+-2.5% c5=- a6=- a7=- a8=- a9=- a10=- r6=- r7=- r8=- r9=- r10=-
Timing setting
(1)Pump vertical direction
(2)Position of gear mark 'Y' at No 1 cylinder's beginning of injection
(3)-
(4)-
----------
----------
a=(130deg)
----------
----------
a=(130deg)