101405-9530 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014059530 32a6504710


101405-9530 INJECTION-PUMP ASSEMBLY
Rating:
52
Buy INJECTION-PUMP ASSEMBLY 101405-9530 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

ZEXEL 101405-9530 1014059530
MITSUBISHI-HEAV 32A6504710 32a6504710

Service parts 101405-9530 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-9790
3. GOVERNOR 105401-1510
4. SUPPLY PUMP 105220-7620
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2)
13. NOZZLE-HOLDER
14. NOZZLE
15. NOZZLE SET

Include in #1:

101405-9530 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101405-9530 1014059530
MITSUBISHI-HEAV 32A6504710 32a6504710


Zexel num
Bosch num
Firm num
Name
101405-9530 
 
32A6504710  MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
S4S-DT K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5720
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.5 3.45 3.55
Rack position
After adjusting injection quantity.
  R=A
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.2
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   108 107 109
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Boost pressure kPa   61.3 61.3
Boost pressure mmHg   460 460
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.6+-0.5
Pump speed r/min   550 550 550
Average injection quantity mm3/st.   17 15.7 18.3
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   E
Rack position   9.4++
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   75 75 80
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Rack limit   *
Boost compensator adjustment
Pump speed r/min   450 450 450
Rack position   R2-1.35
Boost pressure kPa   8 5.3 10.7
Boost pressure mmHg   60 40 80
Boost compensator adjustment_02
Pump speed r/min   450 450 450
Rack position   R2(9.2)
Boost pressure kPa   48 48 48
Boost pressure mmHg   360 360 360

Test data Ex:

Governor adjustment

Test data 101405-9530
N:Pump speed R:Rack position (mm) (1)Notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)The torque control spring does not operate. (4)RACK LIMIT (5)Boost compensator stroke: BCL (6)Set idle sub-spring
----------
K=6 BCL=1.35+-0.1mm
----------

Speed control lever angle

Test data 101405-9530
F:Full speed I:Idle S:Stop (1)Base lever only (2)Set the pump speed at aa. ( At delivery ) (3)When pump speed set at bb (4)Stopper bolt setting
----------
aa=920r/min bb=755r/min
----------
a=3deg+-5deg b=12deg+-5deg c=5deg+-5deg d=32eg+-3deg

Stop lever angle

Test data 101405-9530
N:Pump normal S:Stop the pump. (1)Normal stop (2)Pump speed = aa and rack position = bb, set the stopper bolt (to be sealed at delivery). (3)Corresponding to rack position = cc. (4)Stopper bolt setting (5)Use the hole above R = dd
----------
aa=0r/min bb=3.5-0.5mm cc=19mm dd=25mm
----------
a=6deg+-5deg b=39deg+-5deg

0000001501 I/P WITH LOAD PLUNGER ADJ

Load plunger-equipped pump adjustment 1. Adjust the variation between cylinders and the injection quantity. 2. At Full point A, adjust the pre-stroke to the specified value. 3. After pre-stroke adjustment, reconfirm that the fuel injection quantity and the variation between cylinders is as specified.
----------

----------

Timing setting

Test data 101405-9530
(1)Pump vertical direction (2)Position of camshaft's key groove at No 1 cylinder's beginning of injection (3)After adjusting the injection quantity, adjust at rack position aa. (4)-
----------
aa=9.2mm
----------
a=(50deg)




Have questions with 101405-9530?





Group cross 101405-9530 ZEXEL

Mitsubishi-Heav 

F 019 Z10 950 
3426108050 
INJECTION-PUMP ASSEMBLY
S4K-T
9 400 619 937 
3426106050 
INJECTION-PUMP ASSEMBLY
S4K-T
F 019 Z10 951 
3426107020 
INJECTION-PUMP ASSEMBLY
S4K-T
101405-9530  
 
32A6504710 
INJECTION-PUMP ASSEMBLY
S4S-DT
Back to top