101401-7195 ZEXEL 9 400 611 811 BOSCH INJECTION-PUMP ASSEMBLY 9400611811 1014017195 8971467721


101401-7195 INJECTION-PUMP ASSEMBLY
Rating:
40
Buy INJECTION-PUMP ASSEMBLY 101401-7195 zexel genuine, new aftermarket engine parts with delivery

Information injection-pump assembly

BOSCH 9 400 611 811 9400611811
ZEXEL 101401-7195 1014017195
ISUZU 8971467721 8971467721

Service parts 101401-7195 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-8480
3. GOVERNOR 105932-1722
4. SUPPLY PUMP 105210-6100
5. AUTOM. ADVANCE MECHANIS 105676-5121
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-6051
11. Nozzle and Holder 8-97119-812-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105048-3673
14. NOZZLE 105017-1860
15. NOZZLE SET

Include in #1:

101401-7195 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 611 811 9400611811
ZEXEL 101401-7195 1014017195
ISUZU 8971467721 8971467721


Zexel num
Bosch num
Firm num
Name
101401-7195 
9 400 611 811 
8971467721  ISUZU
INJECTION-PUMP ASSEMBLY
4HF1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-4-2
Pre-stroke mm   4.1 4.05 4.15
Rack position
Point A
  R=A
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.3
Pump speed r/min   960 960 960
Average injection quantity mm3/st.   68.5 66.9 70.1
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H'
Rack position   9.7+-0.5
Pump speed r/min   310 310 310
Average injection quantity mm3/st.   11.5 10.2 12.8
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   H
Rack position   9.6+-0.5
Pump speed r/min   325 325 325
Average injection quantity mm3/st.   10.5 9.2 11.8
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   A
Rack position   R1(11.3)
Pump speed r/min   960 960 960
Average injection quantity mm3/st.   68.5 67.5 69.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   B
Rack position   R1-0.05
Pump speed r/min   1600 1600 1600
Average injection quantity mm3/st.   78.5 74.5 82.5
Fixing the lever   *
Timer adjustment
Pump speed r/min   1050--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1000
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1600
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101401-7195
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=K37
----------

Speed control lever angle

Test data 101401-7195
F:Full speed I:Idle (1)Set the stopper bolt (rack position = aa, speed = bb).
----------
aa=(9.6)mm bb=325r/min
----------
a=41deg+-5deg b=39deg+-3deg

Stop lever angle

Test data 101401-7195
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa
----------
aa=64mm
----------
a=20deg+-5deg b=29deg+-5deg

0000001501 FICD

Test data 101401-7195
(A) applied negative pressure (B) Screw (c) Nut 1. Set the actuator as described below. (1)Confirm that there is clearance between the actuator lever and the speed lever. (2)Loosen the nut (C). (3)Push in the screw (B). (4)Apply P1 from the actuator (A) part. (5)Pull out the screw (B) slowly. (6)Tighten and fix the nut (C) when pump speed is Na and the rack position is Ra. (7)Torque the nut (C) to T1. (8)Apply P2 several times. (9)Confirm that the actuator functions normally. (10)Confirm that there is a clearance between the actuator lever and the speed lever at that time.
----------
P1=53.3kPa(400mmHg) P2=53.3kPa(400mmHg) Na=410r/min Ra=9.4+-0.1mm T1=1.2~1.6N-m(0.12~0.16kgf-m)
----------
L=(5)mm

0000001601 RACK SENSOR

Test data 101401-7195
Rack sensor adjustment 1. Flange type rack sensor (rack sensor adjustment -5*20) (1)These types of rack sensors do not need adjustment. Confirm the performance with the following procedures. (2)Mount the rack sensor main body to the pump main body. (3)Fix the pump lever at full. (4)At supply voltage V1, pump speed N1 and rack position Ra, confirm that the amp's output voltage is Vist. (5)Move the pump lever two or three times. (6)Set again to full. (7)Confirm that the amplifier output voltage is Vist. (8)Fix the caution plate to the upper part of the rack sensor. (For those without the caution plate instructions, make sure the nameplate of the rack sensor carries the "Don't hold here" caution.) (9)Apply red paint to the rack sensor mounting bolts (2 places).
----------
V1=5+-0.01V N1=960r/min Ra=R1(11.3)mm Vist=2.4+-0.28V
----------

Timing setting

Test data 101401-7195
(1)Pump vertical direction (2)Position of gear's standard threaded hole at No 1 cylinder's beginning of injection (3)Stamping position on the A/T outer rim (4)Pump bracket check hole position. (5)At the No 1 cylinder's beginning of injection, align with the projection seen through the bracket's check hole and mark the A/T's bevel C1. (6)B.T.D.C.: aa
----------
aa=7deg
----------
a=(60deg) b=(85deg)




Have questions with 101401-7195?





Group cross 101401-7195 ZEXEL

Isuzu 

 
8971366570 
INJECTION-PUMP ASSEMBLY
4HF1

Nissan 

 
1670089TC2 
INJECTION-PUMP ASSEMBLY
4HF1
F 01G 09U 00C 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8971467720 
INJECTION-PUMP ASSEMBLY
4HF1

Nissan 

 
1670089TD1 
INJECTION-PUMP ASSEMBLY
4HF1
F 01G 09U 00D 
 
INJECTION-PUMP ASSEMBLY

Nissan 

 
1670089TE6 
INJECTION-PUMP ASSEMBLY

Isuzu 

101401-7195  
9 400 611 811 
8971467721 
INJECTION-PUMP ASSEMBLY
4HF1
Back to top